Quick answers
What is this project?
Brownfield project for expansion in DRI based Steel plant to produce Sponge Iron from 60000 TPA to 297,000TPA; Mild Steel Billets from 30000 TPA to 220800 TPA for Rolled Steel Products through Hot Charging 212000 TPA; Captive Power of 9 MW to 32.5 (22.5 MW through WHRB and 10 MW through AFBC); and Fly Ash Bricks from 10500 TPA to 35,000 TPA by M/s. Maa Mangla Ispat Pvt Ltd is a proposed industrial project in Natwarpur, Raigarh, Chhattisgarh. The site covers 148 acres.
Who is building it?
The applicant is Maa Mangla Ispat Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 26 Dec 2024), as of 27 Nov 2026.
Where is it?
In Natwarpur, Raigarh, Chhattisgarh.
How big is it?
It has a stated cost of ₹385.4 crore and a site of 148 acres.
When was it filed?
The application was filed on 18 Dec 2024.
Project details
| Official title | Brownfield project for expansion in DRI based Steel plant to produce Sponge Iron from 60000 TPA to 297,000TPA; Mild Steel Billets from 30000 TPA to 220800 TPA for Rolled Steel Products through Hot Charging 212000 TPA; Captive Power of 9 MW to 32.5 (22.5 MW through WHRB and 10 MW through AFBC); and Fly Ash Bricks from 10500 TPA to 35,000 TPA located at Village - Natwarpur, Tehsil and District Raigarh (C.G.) – 496 001 By M/s. Maa Mangla Ispat Pvt Ltd. |
|---|---|
| Status | Cleared for impact study |
| Status since | 26 Dec 2024 |
| Application filed | 18 Dec 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Maa Mangla Ispat Private Limited |
| Land area | 148 acres (59.9 ha) |
| Project cost | ₹385.4 crore |
| Village / locality | Natwarpur |
| Taluk / tehsil | Raigarh |
| District | Raigarh |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-01839 |
In context
113 applications in Raigarh since January 2022 are in the same category (Industry): 64 approved, 28 filed or under review, and 21 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 148 acres, this one is larger than 65% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Natwarpur, Raigarh, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Greenfield Project of 150 KLD Grain Based Ethanol Plant by M/s B R Refinery LLP — environmental approval granted, 500 m away
- Coal Tar Distillation plant to manufacture 18,000 TPA Coal tar Pitch and its… — cleared for impact study, 3.3 km away
- Coal Tar Distillation plant to manufacture 18,000 TPA Coal tar Pitch and its… — cleared for impact study, 3.3 km away
- Application for Amendment to Tor Letter Issued to M/S. Singhal Steel PVT. LTD.… — under environmental review, 7.6 km away
- Application for Amendment to Tor Letter Issued to M/S. Singhal Steel PVT. LTD.… — cleared for impact study, 7.6 km away
- Environmental Clearance for establishment steel plant comprising of I/O… — cleared for impact study, 7.6 km away
- Proposed 2x800 MW Ultra Super Critical Coal Fired Thermal Power Project By M/s… — cleared for impact study, 8.8 km away
- Enhancement of Production of Iron Ore Pellets From 1250000 Tpa to 1350000 Tpa,… — initial checks, 8.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.