Diversion of Forest land for the Laying of Underground Drinking Water Pipeline from Madhuban Road to Karad Varlipada is a lapsed water and irrigation project in Karad, Dadra & Nagar Haveli, Dadra and Nagar Haveli and Daman and Diu. The site covers 0.1 acres.
Who is building it?
The applicant is Executive Engineer Pwd III Irrigation District Panchayat Dadra and Nagar Haveli.
Has it been approved?
No. The application was lapsed on 17 Mar 2024, so it is no longer under consideration.
Where is it?
In Karad, Dadra & Nagar Haveli, Dadra and Nagar Haveli and Daman and Diu.
How big is it?
It has a stated cost of ₹5 lakh; a site of 0.1 acres and 360 m² of forest land.
When was it filed?
The application was filed on 17 Mar 2024.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Diversion of Forest land for the Laying of Underground Drinking Water Pipeline from…
Project details
| Status | Lapsed |
|---|---|
| Status since | 17 Mar 2024 |
| Application filed | 17 Mar 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Executive Engineer Pwd III Irrigation District Panchayat Dadra and Nagar Haveli |
| Land area | 400 m² |
| Forest land | 360 m² |
| Project cost | ₹5 lakh |
| Village / locality | Karad |
| Taluk / tehsil | Dadra & Nagar Haveli |
| District | Dadra & Nagar Haveli |
| State | Dadra and Nagar Haveli and Daman and Diu |
| Location from | Site area on record |
| Our reference | WID-DN-00116 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 18 Mar 2024 | Under wildlife review | 0.1 acres | ₹5 lakh |
| New project filed 17 Mar 2024 (this page) | Lapsed | 0.1 acres | ₹5 lakh |
In context
5 applications in Dadra & Nagar Haveli since January 2022 are in the same category (Water & irrigation): 0 approved, 3 filed or under review, and 2 withdrawn, lapsed or rejected.
23 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Karad, Dadra & Nagar Haveli, Dadra and Nagar Haveli and Daman and Diu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of Forest land for the Laying of Underground Drinking Water Pipeline… — under wildlife review, 100 m away
- Industrial project by M/s. Unify Texturisers Pvt. Ltd. — environmental approval granted, 1.9 km away
- Industrial project by M/s. Unify Texturisers Pvt. Ltd. — lapsed, 1.9 km away
- Building project by M/s. R. R. Kabel Limited, (Unit-3) — environmental approval granted, 1.9 km away
- Building project by Ram Ratna Wires Limited — lapsed, 2 km away
- Amended Bharat Net/BSNL Linear UG OFC laying Project in DNH BLOCK — under wildlife review, 2.2 km away
- Natural Gas Distribution pipeline Networks by M/s. Gujarat Gas Limited at… — environmental approval granted, 2.6 km away
- Natural Gas Distribution pipeline Networks by M/s. Gujarat Gas Limited at… — cleared for impact study, 2.6 km away
More from Executive Engineer Pwd III Irrigation District Panchayat Dadra and Nagar Haveli in Dadra & Nagar Haveli
- Diversion of Reserved Forest Land for Construction of Village Road in Silli… — initial checks
- Diversion of Reserved Forest/Protected Forest Land for the Laying of… — more information requested
- Diversion of Reserved Forest/Protected Forest Land for the Laying of… — more information requested
- Diversion of Reserved Forest/Protected Forest Land for the Laying of… — more information requested
- Diversion of Reserved Forest Land for the Up-gradation and Widening of the… — forest land use approved
- Diversion of Reserved Forest Land for Up-gradation and Widening of Ghodbari… — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.