Quick answers
What is this project?
66KV Lilo to 66KV Zamrala Ss From 66KV Lathidad-Keriya Line With Laying of 1c X 630 Sq. Mm (6+1) Xlpe Underground Power Cable Line is a proposed power project in Kariyani, Botad, Gujarat. The site covers 0.6 acres.
Who is building it?
The applicant is Gujarat Energy Transmission Corp LTD.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Kariyani, Botad, Gujarat.
How big is it?
It has a stated cost of ₹9.8 crore; a site of 0.6 acres and 2,220 m² of forest land.
When was it filed?
The application was filed on 6 May 2026.
Project details
| Status | More information requested |
|---|---|
| Status since | 3 Nov 2026 |
| Application filed | 6 May 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Gujarat Energy Transmission Corp LTD |
| Land area | 2,500 m² |
| Forest land | 2,220 m² |
| Project cost | ₹9.8 crore |
| Village / locality | Kariyani |
| Taluk / tehsil | Botad |
| District | Botad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-14256 |
Where it is
Kariyani, Botad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 90 mm PE Gas Pipeline Connectivity To Alka Ashutosh Patel Farm House, Ta: Botad — forest land use approved, 6.7 km away
- Jio Digital Fibre Pvt. Ltd. Laying of OFC Line Forest Division Bhavnagar,… — more information requested, 7.9 km away
- 90 mm PE Gas Pipeline Connectivity To Manav Mandir Mand Budhhi Seva Trust, Ta:… — forest land use approved, 8.1 km away
- Upgradation of Existing 2-Lane to 4-Lane of Barwala-Sarangpur-Botad Road… — initial checks, 9.8 km away
- 90 mm Dia MDPE Gas Pipeline route Anjani Spintex Pvt. Ltd. Connectivity At.:… — forest land use approved, 9.9 km away
- Diversion of 0.04 Ha. of Protected Forest Land, I.E., Roadside Strip… — lapsed, 10.6 km away
- Diversion of 0.17432 HA. of PF land for Connectivity From Botad Aluminium LLP… — lapsed, 11 km away
- Proposed New Bio-Medical Waste Treatment Facility at Survey No.: 45, Moje:… — cleared for impact study, 12 km away
More from Gujarat Energy Transmission Corp LTD in Botad
- 66KV Lilo to 220KV Lakhanka Ss From 66KV Gadhada-Ingorala Line With Laying of… — more information requested
All 231 Gujarat Energy Transmission Corp projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.