Quick answers
What is this project?
Expansion in Existing Synthetic Organic Chemicals (Formaldehyde 37%) Manufacturing Unit of M/s. Naksh Formaline Pvt. Ltd is a proposed industrial project in Chhadavada, Bhachau, Kachchh, Gujarat. The site covers 3.9 acres.
Who is building it?
The applicant is Naksh Formaline Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 24 Jul 2024), as of 27 Nov 2026.
Where is it?
In Chhadavada, Bhachau, Kachchh, Gujarat.
How big is it?
It has a stated cost of ₹14.3 crore and a site of 3.9 acres.
When was it filed?
The application was filed on 18 Jul 2024.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 24 Jul 2024 |
| Application filed | 18 Jul 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Naksh Formaline Private Limited |
| Land area | 3.9 acres (1.6 ha) |
| Project cost | ₹14.3 crore |
| Village / locality | Chhadavada |
| Taluk / tehsil | Bhachau |
| District | Kachchh |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-02676 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 13 Apr 2026 | Under environmental review | 3.9 acres | ₹14.3 crore |
| Expansion filed 23 Aug 2025 | Returned to applicant | 3.9 acres | ₹14.3 crore |
| Early planning filed 18 Jul 2024 (this page) | Cleared for impact study | 3.9 acres | ₹14.3 crore |
In context
160 applications in Kachchh since January 2022 are in the same category (Industry): 104 approved, 40 filed or under review, and 16 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 3.9 acres, this one is smaller than 90% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Chhadavada, Bhachau, Kachchh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion in Existing Synthetic Organic Chemicals (Formaldehyde 37%)… — returned to applicant, 0 m away
- Expansion in Existing Synthetic Organic Chemicals (Formaldehyde 37%)… — under environmental review, 0 m away
- Project by M/s Electrotherm (India) Limited — initial checks, 2.1 km away
- Industrial project by M/s Electrotherm (India) Limited — returned to applicant, 2.1 km away
- Shri Jadeja Navalsinh Vajubha — lapsed, 4.6 km away
- Proposed expansion of Secondary Metallurgical Project by Haq Steels and… — environmental approval granted, 8 km away
- Proposed expansion of Secondary Metallurgical Project by Haq Steels and… — environmental approval granted, 8 km away
- Proposed expansion of Metallurgical Plant with CPP [by waste heat Recovery… — more information requested, 8.1 km away
All 3 Naksh Formaline projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.