What is Developing? Open the mapMap

Under environmental reviewIndustry · Kachchh, Gujarat

Expansion in Existing Synthetic Organic Chemicals (Formaldehyde 37%) Manufacturing Unit of M/s. Naksh Formaline Pvt. Ltd.

Expansion in Existing Synthetic Organic Chemicals (Formaldehyde 37%) Manufacturing Unit of M/s. Naksh Formaline Pvt. Ltd is a proposed industrial project in Chhadavada, Bhachau, Kachchh, Gujarat. The site covers 3.9 acres. Its stated project cost is ₹14.3 crore. As of 27 Nov 2026, its status is “Under environmental review” (since 7 Aug 2026).

See it on the live map All projects in Kachchh

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Expansion in Existing Synthetic Organic Chemicals (Formaldehyde 37%) Manufacturing Unit of M/s. Naksh Formaline Pvt. Ltd is a proposed industrial project in Chhadavada, Bhachau, Kachchh, Gujarat. The site covers 3.9 acres.

Who is building it?

The applicant is Naksh Formaline Private Limited.

Has it been approved?

Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.

Where is it?

In Chhadavada, Bhachau, Kachchh, Gujarat.

How big is it?

It has a stated cost of ₹14.3 crore and a site of 3.9 acres.

When was it filed?

The application was filed on 13 Apr 2026.

One of 3 filings for this project. The project's main page, with every filing and where each stands: Expansion in Existing Synthetic Organic Chemicals (Formaldehyde 37%) Manufacturing Unit…

Project details

StatusUnder environmental review
Status since7 Aug 2026
Application filed13 Apr 2026
Approval soughtEnvironmental approval
Application typeExpansion
SectorIndustry
ApplicantNaksh Formaline Private Limited
Land area3.9 acres (1.6 ha)
Project cost₹14.3 crore
Village / localityChhadavada
Taluk / tehsilBhachau
DistrictKachchh
StateGujarat
Location fromSite area on record
Our referenceWID-GJ-11450

All filings for this project

This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 13 Apr 2026 (this page)Under environmental review3.9 acres₹14.3 crore
Expansion filed 23 Aug 2025Returned to applicant3.9 acres₹14.3 crore
Early planning filed 18 Jul 2024Cleared for impact study3.9 acres₹14.3 crore

In context

160 applications in Kachchh since January 2022 are in the same category (Industry): 104 approved, 40 filed or under review, and 16 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 3.9 acres, this one is smaller than 90% of them.

3 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Chhadavada, Bhachau, Kachchh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 3 Naksh Formaline projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.