Quick answers
What is Project by M/s Electrotherm (India) Limited?
This proposed project by M/s Electrotherm (India) Limited is in Chhadavada, Bhachau, Kachchh, Gujarat. The site covers 266.1 acres.
Who is building it?
The applicant is Electrotherm India LTD. (Steel Div.).
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Chhadavada, Bhachau, Kachchh, Gujarat.
How big is it?
It has a stated cost of ₹521.2 crore and a site of 266.1 acres.
When was it filed?
The application was filed on 9 Aug 2024.
Project details
| Status | Initial checks |
|---|---|
| Status since | 9 Aug 2024 |
| Application filed | 9 Aug 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Other |
| Applicant | Electrotherm India LTD. (Steel Div.) |
| Land area | 266.1 acres (107.7 ha) |
| Project cost | ₹521.2 crore |
| Village / locality | Chhadavada |
| Taluk / tehsil | Bhachau |
| District | Kachchh |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-03528 |
In context
23 applications in Kachchh since January 2022 are in the same category (Other): 1 approved, 14 filed or under review, and 7 withdrawn, lapsed or rejected. At 266.1 acres, this one is larger than 83% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Chhadavada, Bhachau, Kachchh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Industrial project by M/s Electrotherm (India) Limited — returned to applicant, 150 m away
- Expansion in Existing Synthetic Organic Chemicals (Formaldehyde 37%)… — under environmental review, 2.1 km away
- Expansion in Existing Synthetic Organic Chemicals (Formaldehyde 37%)… — returned to applicant, 2.1 km away
- Expansion in Existing Synthetic Organic Chemicals (Formaldehyde 37%)… — cleared for impact study, 2.1 km away
- Shri Jadeja Navalsinh Vajubha — lapsed, 4.5 km away
- Proposed expansion of Secondary Metallurgical Project by Haq Steels and… — environmental approval granted, 6 km away
- Proposed expansion of Secondary Metallurgical Project by Haq Steels and… — environmental approval granted, 6 km away
- Proposed expansion of Metallurgical Plant with CPP [by waste heat Recovery… — more information requested, 6.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.