Quick answers
What is this project?
Expansion of Dyes Intermediates (from 8.8 TPM to 185 TPM) at Plot No. 316 & 316-D, 40 Shed Area, GIDC Vapi, Taluka: Pardi, District: Valsad, Gujarat by M/s. Centre Point Industries - EC Extension is a proposed industrial project in Chhiri, Vapi, Valsad, Gujarat. The site covers 0.7 acres.
Who is building it?
The applicant is Centre Point Industries.
Has it been approved?
Not yet. The application is still under review: its status is “Returned to applicant”, as of 27 Nov 2026.
Where is it?
In Chhiri, Vapi, Valsad, Gujarat.
How big is it?
It has a stated cost of ₹80 lakh and a site of 0.7 acres.
When was it filed?
The application was filed on 20 Feb 2024.
Project details
| Status | Returned to applicant |
|---|---|
| Status since | 13 May 2024 |
| Application filed | 20 Feb 2024 |
| Approval sought | Environmental approval |
| Application type | Validity extension |
| Sector | Industry |
| Applicant | Centre Point Industries |
| Land area | 3,000 m² |
| Project cost | ₹80 lakh |
| Village / locality | Chhiri |
| Taluk / tehsil | Vapi |
| District | Valsad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-02838 |
In context
283 applications in Valsad since January 2022 are in the same category (Industry): 174 approved, 79 filed or under review, and 30 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 0.7 acres, this one is smaller than 71% of them.
223 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Chhiri, Vapi, Valsad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Dyes Intermediates manufacturing unit (8.8 TPM to 185 TPM) at… — lapsed, 100 m away
- Expansion of project for manufacturing of Dyes intermediates in existing unit… — cleared for impact study, 100 m away
- APPLICATION FOR AMENDMENT IN EXISTING ENVIRONMENTAL CLEARANCE FOR SYNTHETIC… — returned to applicant, 200 m away
- Proposed Expansion Project for the Manufacturing of Organic Azo Pigment &… — cleared for impact study, 250 m away
- Proposed Expansion Project for the Manufacturing of Organic Azo Pigment &… — withdrawn, 250 m away
- Proposed Expansion of Synthetic Organic Chemicals Manufacturing Unit of M/s.… — under environmental review, 250 m away
- Proposed Expansion of Synthetic Organic Chemicals Manufacturing Unit of M/s.… — returned to applicant, 250 m away
- Proposed Expansion of Synthetic Organic Chemicals Manufacturing Unit of M/s.… — cleared for impact study, 250 m away
More from Centre Point Industries in Valsad
- Expansion of Dyes Intermediates manufacturing unit (8.8 TPM to 185 TPM) at… — lapsed
- Expansion of project for manufacturing of Dyes intermediates in existing unit… — cleared for impact study
All 3 Centre Point Industries projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.