What is Developing? Open the mapMap

Cleared for impact studyIndustry · Valsad, Gujarat

Expansion of project for manufacturing of Dyes intermediates in existing unit located at Plot No: 316, 316/D, 40 shed area, GIDC Estate,Vapi-396195,Tal: Pardi, Dist.: Valsad, Gujarat by M/s Centre Point Industries

Expansion of project for manufacturing of Dyes intermediates in existing unit located at Plot No: 316, 316/D, 40 shed area, GIDC Estate,Vapi-396195,Tal: Pardi, Dist.: Valsad, Gujarat by M/s Centre Point Industries is a proposed industrial project in Vapi, Valsad, Gujarat. The site covers 4.3 acres. Its stated project cost is ₹14.5 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 3 Apr 2025).

See it on the live map All projects in Valsad

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Expansion of project for manufacturing of Dyes intermediates in existing unit located at Plot No: 316, 316/D, 40 shed area, GIDC Estate,Vapi-396195,Tal: Pardi, Dist.: Valsad, Gujarat by M/s Centre Point Industries is a proposed industrial project in Vapi, Valsad, Gujarat. The site covers 4.3 acres.

Who is building it?

The applicant is Centre Point Industries.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 3 Apr 2025), as of 27 Nov 2026.

Where is it?

In Vapi, Valsad, Gujarat.

How big is it?

It has a stated cost of ₹14.5 crore and a site of 4.3 acres.

When was it filed?

The application was filed on 3 Apr 2025.

Project details

StatusCleared for impact study
Status since3 Apr 2025
Application filed3 Apr 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantCentre Point Industries
Land area4.3 acres (1.8 ha)
Project cost₹14.5 crore
Village / localityVapi
Taluk / tehsilVapi
DistrictValsad
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-07278

In context

283 applications in Valsad since January 2022 are in the same category (Industry): 174 approved, 79 filed or under review, and 30 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 4.3 acres, this one is larger than 75% of them.

223 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Vapi, Valsad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Centre Point Industries in Valsad

All 3 Centre Point Industries projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.