Quick answers
What is this project?
Expansion of Dyes Intermediates manufacturing unit (8.8 TPM to 185 TPM) at Plot no.: 316, 40 shed area, GIDC Vapi, District: Valsad, Gujarat by M/s. Centre Point Industries is a lapsed industrial project in Chanod, Vapi, Valsad, Gujarat. The site covers 4.3 acres.
Who is building it?
The applicant is Centre Point Industries.
Has it been approved?
No. The application was lapsed on 19 Jun 2025, so it is no longer under consideration.
Where is it?
In Chanod, Vapi, Valsad, Gujarat.
How big is it?
It has a stated cost of ₹80 lakh and a site of 4.3 acres.
When was it filed?
The application was filed on 12 May 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 19 Jun 2025 |
| Application filed | 12 May 2025 |
| Approval sought | Environmental approval |
| Application type | Other |
| Sector | Industry |
| Applicant | Centre Point Industries |
| Land area | 4.3 acres (1.8 ha) |
| Project cost | ₹80 lakh |
| Village / locality | Chanod |
| Taluk / tehsil | Vapi |
| District | Valsad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-08943 |
In context
283 applications in Valsad since January 2022 are in the same category (Industry): 174 approved, 79 filed or under review, and 30 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 4.3 acres, this one is larger than 75% of them.
223 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Chanod, Vapi, Valsad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of project for manufacturing of Dyes intermediates in existing unit… — cleared for impact study, 0 m away
- Expansion of Dyes Intermediates (from 8.8 TPM to 185 TPM) at Plot No. 316 &… — returned to applicant, 100 m away
- APPLICATION FOR AMENDMENT IN EXISTING ENVIRONMENTAL CLEARANCE FOR SYNTHETIC… — returned to applicant, 150 m away
- Proposed Expansion Project for the Manufacturing of Organic Azo Pigment &… — cleared for impact study, 200 m away
- Proposed Expansion Project for the Manufacturing of Organic Azo Pigment &… — withdrawn, 200 m away
- Amendment in Environment Clearance for setting up manufacturing plant of… — returned to applicant, 300 m away
- Amendment in Environment Clearance for setting up manufacturing plant of… — returned to applicant, 300 m away
- Amendment in Environment Clearance for setting up manufacturing plant of… — returned to applicant, 300 m away
More from Centre Point Industries in Valsad
- Expansion of project for manufacturing of Dyes intermediates in existing unit… — cleared for impact study
- Expansion of Dyes Intermediates (from 8.8 TPM to 185 TPM) at Plot No. 316 &… — returned to applicant
All 3 Centre Point Industries projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.