Kirtan Luxuria is an approved residential project in Abrama, Kamrej, Surat, Gujarat. It plans 216 units in 3 towers of up to 19 floors on 1.4 acres. Its stated project cost is ₹43.9 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 11 Aug 2024).

See it on the live map All projects in Surat

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is Kirtan Luxuria?

Kirtan Luxuria is an approved residential project in Abrama, Kamrej, Surat, Gujarat. It plans 216 units in 3 towers of up to 19 floors on 1.4 acres.

Who is building it?

The applicant is Vipulkumar Donga.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 11 Aug 2024), as of 27 Nov 2026.

Where is it?

In Abrama, Kamrej, Surat, Gujarat.

How big is it?

It has a stated cost of ₹43.9 crore and a site of 1.4 acres.

When was it filed?

The application was filed on 4 May 2024.

Project details

StatusEnvironmental approval granted
Status since11 Aug 2024
Application filed4 May 2024
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantVipulkumar Donga
UseResidential
Units216
Towers3
Floors (tallest)19
Basements1
Parking spaces394
Land area1.4 acres (0.6 ha)
Built-up area40,104 m² (4,31,675 sq ft)
Plot area5,779 m² (62,205 sq ft)
Project cost₹43.9 crore
Village / localityAbrama
Taluk / tehsilKamrej
DistrictSurat
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-03357

What the filings say

What is planned

Kirtan Luxuria is a residential project proposed by the applicant on a plot of 5,779.00 square metres in Abrama, Surat. The applicant's conceptual plan describes a development consisting of three residential buildings, designated as Blocks A, B, and C.

Each of the three buildings is planned to have a height of 68.37 metres, comprising a hollow plinth and 19 upper floors. The project also includes a basement level for parking and services. The total proposed built-up area is 40,104.13 square metres, with a Floor Space Index (FSI) area of 23,113.44 square metres.

Project Components

ItemDetail
Total Plot Area5,779.00 square metres
Net Plot Area5,779.00 square metres
Total Built-up Area40,104.13 square metres
FSI Area23,113.44 square metres
Number of Buildings3 (Blocks A, B, and C)
Building Height68.37 metres
Total FloorsBasement + Ground + 19 Floors
Proposed Green Area906.44 square metres (15.68%)

Layout and design

The layout plan shows the three residential blocks arranged around internal roads. A 7.50-metre wide internal road system provides access within the site, which is bordered by a 90.00-metre wide Ring Road.

The ground floor is primarily dedicated to parking and foyer areas. Each building features multiple lifts (typically three per block) and a central passage. The typical floor plan (2nd to 19th floors) for Blocks A and C shows four units per floor, while Block B follows a similar residential configuration. Units include living rooms, kitchens, bedrooms, and associated wash and balcony areas.

Parking is provided across the basement, ground floor, and hollow plinth levels. The total proposed parking area is 8,707.03 square metres, which includes 4,941.14 square metres for resident cars and 2,891.12 square metres for resident scooters. Visitor parking is allocated 874.77 square metres.

Water, power and access

Water management plans include a 1,50,000 litre per day (KLD) Membrane Bioreactor (MBR) type Sewage Treatment Plant (STP). For firefighting and domestic use, underground tanks with a capacity of 1,00,000 litres are planned.

Power will be supplemented by a 75 KW rooftop solar system occupying 450 square metres of terrace space. Diesel Generator (DG) sets are proposed for emergency backup and will be housed in the basement with acoustic enclosures to manage noise. Access to the site is provided via entries from the adjacent Ring Road.

Environmental safeguards

The applicant's Environmental Management Plan (EMP) outlines measures for both construction and operation phases. To manage solid waste, an automatic Organic Waste Converter (OWC) with a capacity of 350 kg per day is planned.

For rainwater harvesting, the project includes a collection system and two percolation wells. The green belt development plan specifies a total green area of 906.44 square metres, consisting of 319.54 square metres of tree-covered area and 586.90 square metres of lawn. The applicant intends to plant 150 trees, including species such as Asopalav, Gulmohar, Palm, Badam, and Neem.

The estimated capital cost for environmental management is ₹2.39 crore, with an annual recurring cost of ₹18.20 lakh. This budget covers air and noise pollution control, water treatment, waste management, and fire safety systems.

Timeline

The applicant's project report states that the entire project is expected to be completed within approximately four years. Installation of environmental management units is planned to proceed in parallel with the building construction.

Kirtan Luxuria site plan and layout

4 drawings from the project's filings. Sign in free to see them.

Kirtan Luxuria: Site layout: building blocks, internal roads, and Ring Road access (preview)🔒 Sign in free to see it
Site layout: building blocks, internal roads, and Ring Road access
Kirtan Luxuria: Basement plan: parking layout and ramp access (preview)🔒 Sign in free to see it
Basement plan: parking layout and ramp access
Kirtan Luxuria: Floor plans for Blocks A and C: typical residential unit layouts (preview)🔒 Sign in free to see it
Floor plans for Blocks A and C: typical residential unit layouts
Kirtan Luxuria: Building elevation and section showing 19 floors and basement (preview)🔒 Sign in free to see it
Building elevation and section showing 19 floors and basement

In context

489 applications in Surat since January 2022 are in the same category (Buildings & townships): 376 approved, 79 filed or under review, and 34 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.4 acres, this one is smaller than 55% of them.

158 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Abrama, Kamrej, Surat, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.