Quick answers
What is this project?
ADANI GREEN ENERGY LIMITED Proposed Residential Township for Khavda Renewable Energy (Solar Wind Power Generation) Park is an approved residential project in Na, Bhachau, Kachchh, Gujarat. It plans buildings of up to 2 floors on 13.2 acres.
Who is building it?
The applicant is Adani Power Ltd..
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 23 Apr 2024), as of 27 Nov 2026.
Where is it?
In Na, Bhachau, Kachchh, Gujarat.
How big is it?
It has a stated cost of ₹110.7 crore and a site of 13.2 acres.
When was it filed?
The application was filed on 6 Jan 2024.
Project details
| Official title | ADANI GREEN ENERGY LIMITED Proposed Residential Township for Khavda Renewable Energy (Solar Wind Power Generation) Park at Village: Khavda, Taluka: Bhuj, District: Kachchh, Gujarat |
|---|---|
| Status | Environmental approval granted |
| Status since | 23 Apr 2024 |
| Application filed | 6 Jan 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Adani Power Ltd. |
| Use | Residential |
| Floors (tallest) | 2 |
| Parking spaces | 413 |
| Land area | 13.2 acres (5.4 ha) |
| Built-up area | 39,771 m² (4,28,091 sq ft) |
| Project cost | ₹110.7 crore |
| Village / locality | Na |
| Taluk / tehsil | Bhachau |
| District | Kachchh |
| State | Gujarat |
| Location from | Site area on record |
| Our reference | WID-GJ-04012 |
What the filings say
What is planned
Adani Green Energy Limited (AGEL) proposes to develop a permanent residential township to support the operations and maintenance staff of the 30 GW Khavda Renewable Energy Park. The township is designed to accommodate a projected population of 1,189 persons, including residents, guest house occupants, and floating population.
The project consists of several residential and utility blocks with a total of 585 units. The applicant's project report details the following components:
- Residential Blocks: Two 3 BHK blocks and five 2 BHK blocks, all designed as Ground plus two (G+2) structures.
- Guest House: Three blocks (G+2) providing 501 units for single and double occupancy.
- Clubhouse: A Ground plus one (G+1) facility for recreation.
- Shopping Complex: A single-storey ground-level facility.
- Utilities: A temple, a gate complex, a dedicated sub-station with Diesel Generator (DG) sets, and a Sewage Treatment Plant (STP).
| Item | Detail |
|---|---|
| Total Plot Area | 5.35 hectares (13.225 acres) |
| Total Gross Built-up Area | 39,771 sq. m. |
| Achieved FSI | 0.66 |
| Ground Coverage | 13,872 sq. m. (25.92%) |
| Total Residential Units | 84 flats (60 2BHK, 24 3BHK) |
| Guest House Units | 501 rooms |
| Maximum Building Height | 9 metres (Proposed) |
| Estimated Project Cost | ₹110.69 crore |
Layout and design
The township is designed as an RCC framed structure suitable for Seismic Zone V. The master plan includes internal bitumen roads of 7.0 metres width to allow for the movement of fire tenders and ambulances. The layout incorporates 17,187.72 sq. m. (32.21%) of green area and landscape development. Parking is planned for 303 Equivalent Car Units (ECU), significantly exceeding the required 110 ECU, with provisions for electric vehicle charging.
Water, power and access
During the operational phase, the total water requirement is estimated at 216 kilolitres per day (KLD). This includes a fresh water demand of 102 KLD, to be sourced from borewells and treated via a Reverse Osmosis (RO) plant. The remaining 114 KLD will be met through recycled water for flushing and landscaping.
Power requirement for the township is estimated at 2,000 KVA, which will be sourced from the existing renewable energy plant utilities. For emergency backup, two DG sets (100 KVA and 50 KVA) are proposed. The project site is located approximately 70 km from Khavda village and is accessible via NH-341 / GJ-SH-45.
Environmental safeguards
The applicant proposes a decentralized STP with a cumulative capacity of 140 KLD using Moving Bed Biofilm Reactor (MBBR) technology. Treated water will be reused through a dual plumbing system. For solid waste, the township will generate approximately 500 kg per day, of which 60% (300 kg) is biodegradable. An on-site organic waste converter will be installed to process this into manure for the greenbelt.
Stormwater management includes a rainwater harvesting pond with an area of 1,200 sq. m. and a volume of 3,600 cubic metres. The greenbelt will be developed with 670 trees, using indigenous species to act as noise barriers and improve air quality. The environmental management plan budget includes ₹6.05 crore in capital costs and ₹41 lakh in annual recurring expenses for the operational phase.
Timeline
The building construction and infrastructure work are scheduled to be completed within 14 months from the start of construction activity.
ADANI GREEN ENERGY LIMITED Residential Township for Khavda Renewable Energy (Solar Wind Power Generation) Park site plan and layout
4 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
76 applications in Kachchh since January 2022 are in the same category (Buildings & townships): 25 approved, 36 filed or under review, and 13 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 13.2 acres, this one is smaller than 53% of them.
Where it is
Na, Bhachau, Kachchh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Archean Chemical Industries — initial checks, 29.1 km away
- CRZ Clearance of Proposed Salt Manufacturing by Solar Evaporation at Un-… — recommended by coastal authority, 33.5 km away
- Diversion of 9.0039 ha Forest area for proposed 66 KV S/C line from Ext. 66 KV… — forest land use approved, 35.8 km away
- Overhead 66 kV Transmission Line from Substation — under forest review, 36.5 km away
- Diversion of Protected Forest Land for Up-gradation to 2L PS including… — more information requested, 38 km away
- Diversion of Forest Land for Construction of 66 KV Overhead Transmission Line… — under forest review, 38.5 km away
- Diversion of Forest Land for Construction of 66 KV Over Headed Transmission Line — lapsed, 38.7 km away
- Diversion of Protected Forest Land for construction of Green Field By-Pass… — more information requested, 40.4 km away