Shri Mulrajsinh Ghanshyamsinh Parmar is a lapsed mining project in Shekhpar, Muli, Surendranagar, Gujarat. The site covers 4.9 acres.
Who is building it?
The applicant is Parmar Mulrajsinh Ghanshyamsinh.
Has it been approved?
No. The application was lapsed on 16 Feb 2025, so it is no longer under consideration.
Where is it?
In Shekhpar, Muli, Surendranagar, Gujarat.
How big is it?
It has a stated cost of ₹50 lakh and a site of 4.9 acres.
When was it filed?
The application was filed on 6 Nov 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 16 Feb 2025 |
| Application filed | 6 Nov 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Parmar Mulrajsinh Ghanshyamsinh |
| Land area | 4.9 acres (2 ha) |
| Project cost | ₹50 lakh |
| Village / locality | Shekhpar |
| Taluk / tehsil | Muli |
| District | Surendranagar |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-06804 |
In context
271 applications in Surendranagar since January 2022 are in the same category (Mining): 107 approved, 59 filed or under review, and 105 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 4.9 acres, this one is smaller than 55% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Shekhpar, Muli, Surendranagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Industrial project by M/s. T4 Tapes Pvt. Ltd. — environmental approval granted, 1.3 km away
- Ajaysinh Gajendrasinh Zala — not approved, 1.8 km away
- Shri Ajitbhai Khodabhai Solanki — environmental approval granted, 4.6 km away
- 90mm Dia PE GAS Pipeline for laid on Both Side of SH-17 for BAPS Temple… — forest land use approved, 4.6 km away
- Laying of 90/125 Mm Mdpe Pipeline for City Gas Distribution of Png From Muli… — forest land use approved, 6.2 km away
- Project of Integrated Water Supply Scheme Phase - II (PART-A) and S2 S3 (Vadod… — more information requested, 6.3 km away
- Project of Integrated Water Supply Scheme Phase - II (PART-A) and S2 S3 (Vadod… — lapsed, 6.3 km away
- 90mm Dia PE GAS PIPELINE for Laid on Both Side of SH-17 for Future… — forest land use approved, 7.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.