Quick answers
What is this project?
Laying of 90/125 Mm Mdpe Pipeline for City Gas Distribution of Png From Muli to Shekhpar in Taluka Muli, Dist Surendranagar is an approved pipeline project in Godavari, Muli, Surendranagar, Gujarat. The site covers 2.1 acres.
Who is building it?
The applicant is Adani Total Gas Limited.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 28 Apr 2026), as of 27 Nov 2026.
Where is it?
In Godavari, Muli, Surendranagar, Gujarat.
How big is it?
It has a stated cost of ₹4.3 crore; a site of 2.1 acres and 2.1 acres (0.9 ha) of forest land.
When was it filed?
The application was filed on 24 Oct 2024.
Project details
| Official title | Proposal for Grant of Permission for Laying of 90/125 Mm Mdpe Pipeline for City Gas Distribution of Png From Muli to Shekhpar in Taluka Muli, Dist Surendranagar |
|---|---|
| Status | Forest land use approved |
| Status since | 28 Apr 2026 |
| Application filed | 24 Oct 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Adani Total Gas Limited |
| Land area | 2.1 acres (0.9 ha) |
| Forest land | 2.1 acres (0.9 ha) |
| Project cost | ₹4.3 crore |
| Village / locality | Godavari |
| Taluk / tehsil | Muli |
| District | Surendranagar |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-13705 |
In context
26 applications in Surendranagar since January 2022 are in the same category (Pipelines): 16 approved, 9 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 19 months from filing to approval. At 2.1 acres, this one is larger than 74% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Godavari, Muli, Surendranagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Shri Ajitbhai Khodabhai Solanki — environmental approval granted, 2.3 km away
- Ajaysinh Gajendrasinh Zala — not approved, 4.4 km away
- Industrial project by M/s. T4 Tapes Pvt. Ltd. — environmental approval granted, 5.6 km away
- Shri Mulrajsinh Ghanshyamsinh Parmar — lapsed, 6.2 km away
- Project of Integrated Water Supply Scheme Phase - II (PART-A) and S2 S3 (Vadod… — more information requested, 7.5 km away
- Project of Integrated Water Supply Scheme Phase - II (PART-A) and S2 S3 (Vadod… — lapsed, 7.5 km away
- Diversion of 22.8 Ha. Protected Forest Land for Widening of Existing Wadhwan -… — more information requested, 9.4 km away
- 90mm Dia PE GAS Pipeline for laid on Both Side of SH-17 for BAPS Temple… — forest land use approved, 10.2 km away
All 48 Adani Total Gas projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.