Quick answers
What is this project?
90mm Dia PE GAS Pipeline for laid on Both Side of SH-17 for BAPS Temple Complex , Ta: Wadhwan , Dist: Surendranagar is an approved pipeline project in Kherali, Wadhwan, Surendranagar, Gujarat. It seeks 0 acres of forest land.
Who is building it?
The applicant is Gujarat Gas Limited.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 29 Apr 2026), as of 27 Nov 2026.
Where is it?
In Kherali, Wadhwan, Surendranagar, Gujarat.
How big is it?
It has a stated cost of ₹15 lakh and 10 m² of forest land.
When was it filed?
The application was filed on 12 Sept 2023.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 29 Apr 2026 |
| Application filed | 12 Sept 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Gujarat Gas Limited |
| Forest land | 10 m² |
| Project cost | ₹15 lakh |
| Village / locality | Kherali |
| Taluk / tehsil | Wadhwan |
| District | Surendranagar |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-12822 |
In context
26 applications in Surendranagar since January 2022 are in the same category (Pipelines): 16 approved, 9 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 19 months from filing to approval.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kherali, Wadhwan, Surendranagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 90mm Dia PE GAS PIPELINE for Laid on Both Side of SH-17 for Future… — forest land use approved, 2.7 km away
- Shri Mulrajsinh Ghanshyamsinh Parmar — lapsed, 4.6 km away
- Industrial project by M/s. T4 Tapes Pvt. Ltd. — environmental approval granted, 4.7 km away
- Imperial Mall — environmental approval granted, 4.7 km away
- Proposed Expansion of Synthetic Organic Chemicals (Reactive Dyes)manufacturing… — environmental approval granted, 6 km away
- Project of Integrated Water Supply Scheme Phase - II (PART-A) and S2 S3 (Vadod… — more information requested, 6.2 km away
- Project of Integrated Water Supply Scheme Phase - II (PART-A) and S2 S3 (Vadod… — lapsed, 6.2 km away
- Ajaysinh Gajendrasinh Zala — not approved, 6.2 km away
More from Gujarat Gas Limited in Surendranagar
- 125/90 MM Dia PE Gas Pipeline to Connect DCS to Upcoming Domestic Connectivity… — forest land use approved
- 125 Mm Pe Gas Pipeline to Connect Upcoming New Industrial Connection Jay… — forest land use approved
- 90mm Dia. Pe Natural Gas Pipeline Parallel and Crossing to Chuda Bhrugupur… — forest land use approved
- Rajrishi Petroleum CNG Station Connectivity — forest land use approved
- 90mm Dia PE GAS PIPELINE for Laid on Both Side of SH-17 for Future… — forest land use approved
- 125 mm Dia. PE Gas Pipeline route Rajrajeshwardham Jhakhan To Ahmedabad… — forest land use approved
7 Gujarat Gas projects in Surendranagar
All 289 Gujarat Gas projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.