Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 6 Jan 2026 |
| Application filed | 29 Nov 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Praneetha Ecocables Limited |
| Use | Industrial |
| Units | 1 |
| Towers | 1 |
| Land area | 27.4 acres (11.1 ha) |
| Built-up area | 20,000 m² (2,15,278 sq ft) |
| Plot area | 1,10,837 m² (11,93,038 sq ft) |
| Project cost | ₹750 crore |
| Village / locality | Virochannagar |
| Taluk / tehsil | Sanand |
| District | Ahmadabad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-09189 |
In context
1,175 applications in Ahmadabad since January 2022 are in the same category (Buildings & townships): 916 approved, 201 filed or under review, and 58 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 27.4 acres, this one is larger than 93% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Virochannagar, Sanand, Ahmadabad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed project of Industrial Shed for Automobile Manufacturing (integrated… — initial checks, 2.4 km away
- Proposed project of Industrial Shed for Automobile Manufacturing (integrated… — environmental approval granted, 2.4 km away
- Proposed project of Industrial Shed for Automobile Manufacturing (integrated… — cleared for impact study, 2.4 km away
- Industrial project by M/s. Raviraj Foils. Ltd. — cleared for impact study, 4.5 km away
- Industrial Buildings/Sheds (Extension of Factory Built-Up Area for Ancillary… — initial checks, 5.3 km away
- Industrial Buildings/Sheds (Extension of Factory Built-Up Area for Ancillary… — under environmental review, 5.3 km away
- Greenfield ~20gwh Lithium-Ion Cell Manufacturing Plant — environmental approval granted, 6.8 km away
- Greenfield ~20gwh Lithium-Ion Cell Manufacturing Plant — cleared for impact study, 6.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.