Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 10 Jul 2026 |
| Application filed | 25 May 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Maruti Suzuki India Limited |
| Use | Industrial |
| Towers | 86 |
| Parking spaces | 9,200 |
| Land area | 1,569.4 acres (635.1 ha) |
| Built-up area | 13,55,711 m² (1,45,92,738 sq ft) |
| Plot area | 63,51,321 m² (6,83,64,984 sq ft) |
| Project cost | ₹36,312.4 crore |
| Village / locality | Khoraj |
| Taluk / tehsil | Sanand |
| District | Ahmadabad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-11685 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 3 Oct 2026 | Initial checks | 1,569.4 acres | ₹36,312.4 crore |
| New project filed 25 May 2026 (this page) | Environmental approval granted | 1,569.4 acres | ₹36,312.4 crore |
| Early planning filed 15 Apr 2026 | Cleared for impact study | 1,569.4 acres | ₹36,312.4 crore |
In context
1,175 applications in Ahmadabad since January 2022 are in the same category (Buildings & townships): 916 approved, 201 filed or under review, and 58 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1,569.4 acres, this one is larger than 99% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Khoraj, Sanand, Ahmadabad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed project of Industrial Shed for Automobile Manufacturing (integrated… — initial checks, 0 m away
- Proposed project of Industrial Shed for Automobile Manufacturing (integrated… — cleared for impact study, 0 m away
- Manufacturing Unit for Wires and Cables by Praneetha Ecocables Limited (PEL) — environmental approval granted, 2.4 km away
- Industrial project by M/s. Raviraj Foils. Ltd. — cleared for impact study, 4.1 km away
- Industrial Buildings/Sheds (Extension of Factory Built-Up Area for Ancillary… — initial checks, 4.9 km away
- Industrial Buildings/Sheds (Extension of Factory Built-Up Area for Ancillary… — under environmental review, 4.9 km away
- Greenfield ~20gwh Lithium-Ion Cell Manufacturing Plant — environmental approval granted, 6.2 km away
- Greenfield ~20gwh Lithium-Ion Cell Manufacturing Plant — cleared for impact study, 6.2 km away
3 Maruti Suzuki India projects in Ahmedabad
All 11 Maruti Suzuki India projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.