Quick answers
What is this project?
Laying proposed 90/63/32 mm dia. PE Gas Pipeline for Ozar Village Connectivity Project, Ta: Umargam, Dist: Valsad is an approved pipeline project in Ozar, Valsad, Gujarat. It seeks 0 acres of forest land.
Who is building it?
The applicant is Gujarat Gas Limited.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 21 Feb 2026), as of 27 Nov 2026.
Where is it?
In Ozar, Valsad, Gujarat.
How big is it?
It has a stated cost of ₹41 lakh and 30 m² of forest land.
When was it filed?
The application was filed on 12 Dec 2025.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 21 Feb 2026 |
| Application filed | 12 Dec 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Gujarat Gas Limited |
| Forest land | 30 m² |
| Project cost | ₹41 lakh |
| Village / locality | Ozar |
| Taluk / tehsil | Valsad |
| District | Valsad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-12050 |
In context
35 applications in Valsad since January 2022 are in the same category (Pipelines): 22 approved, 4 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 8 months from filing to approval.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ozar, Valsad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Building project by M/S. Polycab India Limited — environmental approval granted, 1.4 km away
- 765 kV D/C South Olpad - Boisar (II) Transmission Line in the state of Gujarat — forest land use approved, 4.9 km away
- Parmarath Ke Kaja, Velvach — lapsed, 6.8 km away
- Diversion of 0.1620 Ha Protected Forest Land in Favour of Dharampur… — more information requested, 7.9 km away
- Underground Drainage Line Phase-II (SJMMSVY) Project — more information requested, 8.4 km away
- Shri Kirankumar R Patel (Thakkarwada Blacktrap Lease) — not approved, 8.7 km away
- Diversion of Protected Forest Land for four laning of Pardi - Kaprada Road… — lapsed, 8.9 km away
- Building project by M/s. POLYCAB INDIA LIMITED. — under environmental review, 9.2 km away
More from Gujarat Gas Limited in Valsad
- Diversion of 0.03268 HA. of PF land for Reliable Packaging & Ayurvedic College… — more information requested
- Diversion of 0.00048 Ha. of PF Land for laying of 90 mm PE Pipeline Network to… — more information requested
- Gas Distribution Network in Valsad Taluka & Surrounding Areas, Diversion of… — lapsed
- Diversion of 0.1544 Ha. protected forest land for laying 125/90 mm dia. MDPE… — lapsed
- Diversion of 0.0508 Hectare Protected Forest Land for Laying 125/90 Mm… — lapsed
- Permission for laying 4" dia. steel & 90 mm dia. PE pipeline along NH-48 &… — forest land use approved
29 Gujarat Gas projects in Valsad
All 289 Gujarat Gas projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.