What is this project?
Diversion of 0.03268 HA. of PF land for Reliable Packaging & Ayurvedic College connections, Ta: Vapi Dist: Valsad is a proposed pipeline project in Karvad, Vapi, Valsad, Gujarat. The site covers 0.1 acres.
Who is building it?
The applicant is Gujarat Gas Limited.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Karvad, Vapi, Valsad, Gujarat.
How big is it?
It has a stated cost of ₹45 lakh; a site of 0.1 acres and 330 m² of forest land.
When was it filed?
The application was filed on 1 Sept 2026.
Project details
| Status | More information requested |
|---|---|
| Status since | 6 Nov 2026 |
| Application filed | 1 Sept 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Gujarat Gas Limited |
| Land area | 300 m² |
| Forest land | 330 m² |
| Project cost | ₹45 lakh |
| Village / locality | Karvad |
| Taluk / tehsil | Vapi |
| District | Valsad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-12729 |
In context
35 applications in Valsad since January 2022 are in the same category (Pipelines): 22 approved, 4 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 8 months from filing to approval. At 0.1 acres, this one is smaller than 83% of them.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Karvad, Vapi, Valsad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 0.2993 Ha Protected forest land for the project of Construction… — lapsed, 1.2 km away
- Permission for laying 6" dia. steel Natural Gas pipeline across to Ambica… — forest land use approved, 1.9 km away
- Industrial project by M/s. Waaree Green Aluminium Pvt. Ltd — cleared for impact study, 1.9 km away
- 6" Dia Steel Gas Pipeline Network for Connectivity Near Olgam CGS to Proposed… — forest land use approved, 2.4 km away
- 90 mm PE Pipeline And 4" Steel Pipeline From Bhramhdev Bapa Mandir To Testy… — forest land use approved, 3.2 km away
- Diversion of 0.13 Ha Reserved Forest Land for Non-Forest Purpose Construction… — lapsed, 4.4 km away
- Submission of 0.8848 Hac. Forest land proposal for Diversion for Social Forest… — forest land use approved, 5.7 km away
- Widening and strengthening of Valsad-Gundlav-Khergam road km 2/0 to 16/0 Ta.… — more information requested, 5.8 km away
More from Gujarat Gas Limited in Valsad
- Diversion of 0.00048 Ha. of PF Land for laying of 90 mm PE Pipeline Network to… — more information requested
- Gas Distribution Network in Valsad Taluka & Surrounding Areas, Diversion of… — lapsed
- Diversion of 0.1544 Ha. protected forest land for laying 125/90 mm dia. MDPE… — lapsed
- Diversion of 0.0508 Hectare Protected Forest Land for Laying 125/90 Mm… — lapsed
- Permission for laying 4" dia. steel & 90 mm dia. PE pipeline along NH-48 &… — forest land use approved
- Permission for laying 6" dia. steel Natural Gas pipeline across to Ambica… — forest land use approved
29 Gujarat Gas projects in Valsad
All 289 Gujarat Gas projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.