Quick answers
What is this project?
Permission for laying 4" dia. steel & 90 mm dia. PE pipeline along NH-48 & SH-185 in Bhilad Town for Supreme Nonwoven Industry Connectivity Project, Taluka Umargam, District Valsad of Valsad GA is an approved pipeline project in Bhilad, Umbergaon, Valsad, Gujarat. The site covers 0.1 acres.
Who is building it?
The applicant is Gujarat Gas Limited.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 18 Apr 2026), as of 27 Nov 2026.
Where is it?
In Bhilad, Umbergaon, Valsad, Gujarat.
How big is it?
It has a stated cost of ₹10 lakh; a site of 0.1 acres and 430 m² of forest land.
When was it filed?
The application was filed on 20 Feb 2026.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 18 Apr 2026 |
| Application filed | 20 Feb 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Gujarat Gas Limited |
| Land area | 400 m² |
| Forest land | 430 m² |
| Project cost | ₹10 lakh |
| Village / locality | Bhilad |
| Taluk / tehsil | Umbergaon |
| District | Valsad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-12864 |
In context
35 applications in Valsad since January 2022 are in the same category (Pipelines): 22 approved, 4 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 8 months from filing to approval. At 0.1 acres, this one is smaller than 74% of them.
61 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bhilad, Umbergaon, Valsad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Angam Blacktrap Mining Project, Survey No 62/2 Paiki proposed by Mukeshbhai… — not approved, 3.1 km away
- Angam Blacktrap Mining Project, Survey No 62/2 Paiki — withdrawn, 3.1 km away
- Mukeshbhai Bhagubhai Patel (Angam Blacktrap Mine ) — lapsed, 3.1 km away
- Diversion of Protected Forest Land for Water Pipeline — forest land use approved, 3.9 km away
- Proposed Change in Product Mix With No Increase in Pollution Load by M/S N R… — initial checks, 3.9 km away
- VUP with Service Road at Talvada Surat- Dahisar Section of NH-48 in the State… — forest land use approved, 4 km away
- Industrial project by M/s. LUCKY PLY & LAMINATES. — returned to applicant, 4.2 km away
- Sarigam Blacktrap Mining Project, Survey No. 69/1 Paiki 4, Proposed by M/s… — not approved, 4.4 km away
More from Gujarat Gas Limited in Valsad
- Diversion of 0.03268 HA. of PF land for Reliable Packaging & Ayurvedic College… — more information requested
- Diversion of 0.00048 Ha. of PF Land for laying of 90 mm PE Pipeline Network to… — more information requested
- Gas Distribution Network in Valsad Taluka & Surrounding Areas, Diversion of… — lapsed
- Diversion of 0.1544 Ha. protected forest land for laying 125/90 mm dia. MDPE… — lapsed
- Diversion of 0.0508 Hectare Protected Forest Land for Laying 125/90 Mm… — lapsed
- Permission for laying 6" dia. steel Natural Gas pipeline across to Ambica… — forest land use approved
29 Gujarat Gas projects in Valsad
All 289 Gujarat Gas projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.