Quick answers
What is this project?
Installation and Laying of New Fiber Connectivity at Ru Location Connecting Various State-Level Offices is a lapsed building project in Gandhinagar (Nac), Gandhinagar, Gujarat. It seeks 0.5 acres of forest land.
Who is building it?
The applicant is Vijayshree Electro Mech PVT LTD.
Has it been approved?
No. The application was lapsed on 9 Jan 2024, so it is no longer under consideration.
Where is it?
In Gandhinagar (Nac), Gandhinagar, Gujarat.
How big is it?
It has a stated cost of ₹1,000 crore and 2,000 m² of forest land.
When was it filed?
The application was filed on 6 Oct 2023.
Project details
| Status | Lapsed |
|---|---|
| Status since | 9 Jan 2024 |
| Application filed | 6 Oct 2023 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Buildings & townships |
| Applicant | Vijayshree Electro Mech PVT LTD |
| Forest land | 2,000 m² |
| Project cost | ₹1,000 crore |
| Village / locality | Gandhinagar (Nac) |
| Taluk / tehsil | Gandhinagar |
| District | Gandhinagar |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-12857 |
In context
472 applications in Gandhinagar since January 2022 are in the same category (Buildings & townships): 365 approved, 79 filed or under review, and 28 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval.
90 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Gandhinagar (Nac), Gandhinagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of Forest Land for the Non-Forest Purpose Construction &… — lapsed, 300 m away
- Jio Digital Fibre Pvt. Ltd. Laying of OFC line GMC GIL Police Bhanvan CHH road… — forest land use approved, 450 m away
- Diversion of Forest Land (Area - 19.9168 Ha) for Non-Forest Purposes for the… — under forest review, 500 m away
- Diversion of 4.9206 ha. Protected Forest Land for construction of elevated… — lapsed, 750 m away
- Design, Supply, Installation, Integration, Commission, Operations and… — lapsed, 800 m away
- Diversion of 4.9206 ha. Protected Forest Land for construction of elevated… — forest land use approved, 1000 m away
- Office Building Including annex building and development of bulk services for… — environmental approval granted, 1 km away
- Laying of 132 Kv EHV Transmission line for commercial consumer GMRCL Metro — forest land use approved, 1.2 km away