0.01858 ha Reserved forest land for the project of Construction New SBI Branch At Satkashi, Survey Number -30, Ta. Songadh Dist. Tapi Gujarat state is a rejected survey and exploration project in Satkashi, Songadh, Tapi, Gujarat. The site covers 0 acres.
Who is building it?
The applicant is State Bank of India.
Has it been approved?
No. The application was rejected on 2 May 2026.
Where is it?
In Satkashi, Songadh, Tapi, Gujarat.
How big is it?
It has a stated cost of ₹55 lakh; a site of 0 acres and 190 m² of forest land.
When was it filed?
The application was filed on 3 Apr 2024.
Project details
| Official title | Proposal for 0.01858 ha Reserved forest land for the project of Construction New SBI Branch At Satkashi, Survey Number -30, Ta. Songadh Dist. Tapi Gujarat state. |
|---|---|
| Status | Not approved |
| Status since | 2 May 2026 |
| Application filed | 3 Apr 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Survey & exploration |
| Applicant | State Bank of India |
| Land area | 200 m² |
| Forest land | 190 m² |
| Project cost | ₹55 lakh |
| Village / locality | Satkashi |
| Taluk / tehsil | Songadh |
| District | Tapi |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-12111 |
In context
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Satkashi, Songadh, Tapi, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 0.1858 ha Reserved forest land for the project of Construction of New SBI… — lapsed, 100 m away
- Widening and Strengthening Of Boarda-Satkashi-Sherulla (Km. 0/000 To 29/500).… — lapsed, 700 m away
- Widening and Strengthening Of Boarda-Satkashi-Sherulla (Km. 0/000 To 29/500).… — more information requested, 700 m away
- Satkashi Pumped Storage Hydro Electric Project (330 MW) — cleared for impact study, 3.3 km away
- Satkashi Pumped Storage Hydro Electric Project (330 MW) — lapsed, 3.8 km away
- Amalpada Pumped Storage Hydro Electric Project (300 MW) — cleared for impact study, 4.1 km away
- Permission for Drilling of Boreholes in Trapty Range, Vyara Forest Division,… — lapsed, 6.7 km away
- Laying OFC for 4G coverage of uncovered villages through USOF, Babarghat T… — lapsed, 7.5 km away
More from State Bank of India in Tapi
All 5 State Bank of India projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.