Quick answers
What is Amalpada Pumped Storage Hydro Electric Project (300 MW)?
Amalpada Pumped Storage Hydro Electric Project (300 MW) is a proposed water and irrigation project in Borda, Songadh, Tapi, Gujarat. The site covers 725.6 acres.
Who is building it?
The applicant is Gujarat State Electricity Corporation Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 6 Oct 2024), as of 27 Nov 2026.
Where is it?
In Borda, Songadh, Tapi, Gujarat.
How big is it?
It has a stated cost of ₹1,647.9 crore and a site of 725.6 acres.
When was it filed?
The application was filed on 3 Aug 2024.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 6 Oct 2024 |
| Application filed | 3 Aug 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Water & irrigation |
| Applicant | Gujarat State Electricity Corporation Limited |
| Land area | 725.6 acres (293.7 ha) |
| Project cost | ₹1,647.9 crore |
| Village / locality | Borda |
| Taluk / tehsil | Songadh |
| District | Tapi |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-05949 |
In context
9 applications in Tapi since January 2022 are in the same category (Water & irrigation): 6 approved, 1 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Borda, Songadh, Tapi, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 0.01858 ha Reserved forest land for the project of Construction New SBI Branch… — not approved, 4.1 km away
- 0.1858 ha Reserved forest land for the project of Construction of New SBI… — lapsed, 4.1 km away
- Widening and Strengthening Of Boarda-Satkashi-Sherulla (Km. 0/000 To 29/500).… — lapsed, 4.6 km away
- Widening and Strengthening Of Boarda-Satkashi-Sherulla (Km. 0/000 To 29/500).… — more information requested, 4.6 km away
- Satkashi Pumped Storage Hydro Electric Project (330 MW) — cleared for impact study, 6.9 km away
- Satkashi Pumped Storage Hydro Electric Project (330 MW) — lapsed, 7.2 km away
- Permission for Drilling of Boreholes in Trapty Range, Vyara Forest Division,… — lapsed, 10.2 km away
- Laying OFC for 4G coverage of uncovered villages through USOF, Babarghat T… — lapsed, 11.5 km away
More from Gujarat State Electricity Corporation Limited in Tapi
- Serula Pumped Storage Hydro Electric Project (960 MW) — more information requested
- Juni Kayaliwel Pumped Storage Hydro Electric Project (300 MW) — lapsed
- Satkashi Pumped Storage Hydro Electric Project (330 MW) — lapsed
- Serula Pumped Storage Hydro Electric Project (960 MW) — lapsed
- Serula Pumped Storage Hydro Electric Project (960 MW) — lapsed
- Juni Kayaliwel Pumped Storage Hydro Electric Project (300 MW) — lapsed
11 Gujarat State Electricity Corporation projects in Tapi
All 25 Gujarat State Electricity Corporation projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.