Quick answers
What is this project?
Widening and Strengthening Of Boarda-Satkashi-Sherulla (Km. 0/000 To 29/500). Dist. Tapi is a proposed road project in Na, Songadh, Tapi, Gujarat. It seeks 35.4 acres of forest land.
Who is building it?
The applicant is Executive Engineer.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Na, Songadh, Tapi, Gujarat.
How big is it?
It has a stated cost of ₹45.4 crore and 35.4 acres (14.3 ha) of forest land.
When was it filed?
The application was filed on 23 Nov 2022.
Project details
| Status | More information requested |
|---|---|
| Status since | 21 Aug 2026 |
| Application filed | 23 Nov 2022 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Executive Engineer |
| Forest land | 35.4 acres (14.3 ha) |
| Project cost | ₹45.4 crore |
| Village / locality | Na |
| Taluk / tehsil | Songadh |
| District | Tapi |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-13475 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 8 Jun 2023 | Lapsed | ₹45.4 crore | |
| New project filed 23 Nov 2022 (this page) | More information requested | ₹45.4 crore |
In context
16 applications in Tapi since January 2022 are in the same category (Roads & highways): 4 approved, 7 filed or under review, and 5 withdrawn, lapsed or rejected.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Na, Songadh, Tapi, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Widening and Strengthening Of Boarda-Satkashi-Sherulla (Km. 0/000 To 29/500).… — lapsed, 0 m away
- 0.1858 ha Reserved forest land for the project of Construction of New SBI… — lapsed, 700 m away
- 0.01858 ha Reserved forest land for the project of Construction New SBI Branch… — not approved, 700 m away
- Satkashi Pumped Storage Hydro Electric Project (330 MW) — cleared for impact study, 3.2 km away
- Satkashi Pumped Storage Hydro Electric Project (330 MW) — lapsed, 3.8 km away
- Amalpada Pumped Storage Hydro Electric Project (300 MW) — cleared for impact study, 4.6 km away
- Permission for Drilling of Boreholes in Trapty Range, Vyara Forest Division,… — lapsed, 6.6 km away
- Laying OFC for 4G coverage of uncovered villages through USOF, Babarghat T… — lapsed, 6.9 km away
More from Executive Engineer in Tapi
- Diversion of 15.5685 ha. PF (8.4681 ha.) & RF (7.1004 ha.) Land for widening… — more information requested
- Widening and Strengthening of Songadh Ukai Sherulla Road (KM 2/800 to 18/500)… — more information requested
- of Widening and Strengthening of Tokarava-Chimkuva-Medha-Chimer-Khapatiya Road… — lapsed