Quick answers
What is Aug. Variyav RWSS ph-2?
Aug. Variyav RWSS ph-2 is a lapsed project in Atodra, Olpad, Surat, Gujarat.
Who is building it?
The applicant is Gujarat Water Supply and Sewerage Board.
Has it been approved?
No. The application was lapsed on 10 Aug 2023, so it is no longer under consideration.
Where is it?
In Atodra, Olpad, Surat, Gujarat.
How big is it?
It has a stated cost of ₹89.7 crore.
When was it filed?
The application was filed on 24 Mar 2023.
Project details
| Status | Lapsed |
|---|---|
| Status since | 10 Aug 2023 |
| Application filed | 24 Mar 2023 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Other |
| Applicant | Gujarat Water Supply and Sewerage Board |
| Project cost | ₹89.7 crore |
| Village / locality | Atodra |
| Taluk / tehsil | Olpad |
| District | Surat |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-13732 |
In context
23 applications in Surat since January 2022 are in the same category (Other): 4 approved, 13 filed or under review, and 6 withdrawn, lapsed or rejected.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Atodra, Olpad, Surat, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Widening and Strengthening of Delad Patiya to Vasavri Road Km 312/900 to… — more information requested, 4.1 km away
- Diversion of Protected Forest Land for widening of Sayan – Kadarma Road from… — lapsed, 4.5 km away
- Diversion of 0.1856 ha. Protected Forest land for the grant permission for… — lapsed, 5.3 km away
- Diversion of Protected Forest Land for widening of Sayan – Kareli – Mulad Road… — lapsed, 5.4 km away
- Road work from widening work from subgrade to wearing course as per MoRTH 2013… — lapsed, 5.5 km away
- Diversion of 0.6518 Ha. of Protected Forest land for laying of PE/Steel Gas… — forest land use approved, 6.2 km away
- Nilkanth Trinity — environmental approval granted, 6.2 km away
- Nilkanth Luxuria — environmental approval granted, 6.4 km away
More from Gujarat Water Supply and Sewerage Board in Surat
- Grant of Permission Required for laying of Drinking water pipeline, crossing /… — forest land use approved
- Diversion of 1.50 Ha. Reserved Forest land for the Construction of New water… — lapsed
- Grant of Permission Required for Laying of Drinking Water Pipeline, Crossing /… — lapsed
- Aug. Variyav Reginal Water Supply Scheme Ph-2 — lapsed
- Grant of Permission Required for Laying of Drinking Water Pipeline, Crossing /… — lapsed
6 Gujarat Water Supply and Sewerage Board projects in Surat
All 26 Gujarat Water Supply and Sewerage Board projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.