Quick answers
What is this project?
Gas Distribution Network in Dharampur Taluka of Valsad GA (Baroliya Village Connectivity) is an approved pipeline project in Baroliya, Dharampur, Valsad, Gujarat. The site covers 0.3 acres.
Who is building it?
The applicant is Gujarat Gas Limited.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 1 Nov 2023), as of 27 Nov 2026.
Where is it?
In Baroliya, Dharampur, Valsad, Gujarat.
How big is it?
It has a stated cost of ₹10 lakh; a site of 0.3 acres and 1,170 m² of forest land.
When was it filed?
The application was filed on 12 Jan 2023.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 1 Nov 2023 |
| Application filed | 12 Jan 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Gujarat Gas Limited |
| Land area | 1,200 m² |
| Forest land | 1,170 m² |
| Project cost | ₹10 lakh |
| Village / locality | Baroliya |
| Taluk / tehsil | Dharampur |
| District | Valsad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-12693 |
In context
35 applications in Valsad since January 2022 are in the same category (Pipelines): 22 approved, 4 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 8 months from filing to approval. At 0.3 acres, this one is smaller than 52% of them.
10 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Baroliya, Dharampur, Valsad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Utilization of 0.89 Ha Reserved Forest Land for Establishment of Snake… — lapsed, 1.2 km away
- Utilization of Reserved Forest Land for Establishment of Snake Research… — lapsed, 1.2 km away
- Zariya Black Trap Block — lapsed, 1.9 km away
- Narsinhbhai D Chaudhari — under environmental review, 1.9 km away
- Narshinhbhai D Chaudhari (Zariya Blacktrap Mine) — environmental approval granted, 1.9 km away
- Narsinhbhai D Chaudhari (Zariya Blacktrap Block) — lapsed, 1.9 km away
- Dharampur Water Pipe line — forest land use approved, 2.6 km away
- Diversion of 0.3400 Ha Protected Forest Land in Favour of Dharampur… — more information requested, 3.9 km away
More from Gujarat Gas Limited in Valsad
- Diversion of 0.03268 HA. of PF land for Reliable Packaging & Ayurvedic College… — more information requested
- Diversion of 0.00048 Ha. of PF Land for laying of 90 mm PE Pipeline Network to… — more information requested
- Gas Distribution Network in Valsad Taluka & Surrounding Areas, Diversion of… — lapsed
- Diversion of 0.1544 Ha. protected forest land for laying 125/90 mm dia. MDPE… — lapsed
- Diversion of 0.0508 Hectare Protected Forest Land for Laying 125/90 Mm… — lapsed
- Permission for laying 4" dia. steel & 90 mm dia. PE pipeline along NH-48 &… — forest land use approved
29 Gujarat Gas projects in Valsad
All 289 Gujarat Gas projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.