Submission of 0.8848 Hac. Forest land proposal for Diversion for Social Forest Land proposal for forest clearance for Laying of 66KV D/C LILO cable 1C, 630 sq. mm 2x (3+1) XLPE power cable from loc.16 of 66kV Atgam- Gundlav line to new proposed 66KV KALWADA Sub- Station. [Length: 6.5 Km] is an approved power project in Segva, Valsad, Gujarat. The site covers 2.2 acres.
Who is building it?
The applicant is Gujarat Energy Transmission Corp LTD.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 16 Apr 2026), as of 27 Nov 2026.
Where is it?
In Segva, Valsad, Gujarat.
How big is it?
It has a stated cost of ₹20 crore; a site of 2.2 acres and 2.2 acres (0.9 ha) of forest land.
When was it filed?
The application was filed on 5 Mar 2025.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 16 Apr 2026 |
| Application filed | 5 Mar 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Gujarat Energy Transmission Corp LTD |
| Land area | 2.2 acres (0.9 ha) |
| Forest land | 2.2 acres (0.9 ha) |
| Project cost | ₹20 crore |
| Village / locality | Segva |
| Taluk / tehsil | Valsad |
| District | Valsad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-14166 |
In context
16 applications in Valsad since January 2022 are in the same category (Power): 9 approved, 3 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 13 months from filing to approval. At 2.2 acres, this one is smaller than 54% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Segva, Valsad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Building project by M/s. POLYCAB INDIA LIMITED. — under environmental review, 2.8 km away
- Ashutosh Ravindranath Mishra — environmental approval granted, 3.4 km away
- Diversion of 0.00048 Ha. of PF Land for laying of 90 mm PE Pipeline Network to… — more information requested, 3.7 km away
- Shri Kirankumar R Patel (Thakkarwada Blacktrap Lease) — not approved, 3.7 km away
- Widening and strengthening of Valsad-Gundlav-Khergam road km 2/0 to 16/0 Ta.… — more information requested, 4.3 km away
- Industrial project by M/s. Stalwart Advance Material Industries — under environmental review, 5.6 km away
- Industrial project by M/s. Stalwart Advance Material Industries — under environmental review, 5.6 km away
- Diversion of 0.03268 HA. of PF land for Reliable Packaging & Ayurvedic College… — more information requested, 5.7 km away
More from Gujarat Energy Transmission Corp LTD in Valsad
- Submission Proposal for Diversion of Forest Land of 0.0217 Hectare for forest… — lapsed
- Submission of 0.3521 Forest Land (Protected) Proposal for Diversion for Social… — under forest review
- Diversion of 19.3778 Ha Reserved Forest Land for construction of 66KV… — under forest review
- Diversion of 3.6709 Ha. Of Reserved Forest Land for construction of 66KV… — lapsed
- Diversion of 8.4109 Ha. Of Reserved Forest Land for construction of 66 KV… — more information requested
- Diversion of Forest Land of 0.0116 Hectare for forest clearance by Laying of… — forest land use approved
12 Gujarat Energy Transmission Corp projects in Valsad
All 231 Gujarat Energy Transmission Corp projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.