66 KV Line from existing 66 KV (220 KV) Kukma Substation to Proposed 66 KV of Executive Engineer, Salinity Control Division Bhuj with 630 Sq.mm (3+1)

66 KV Line from existing 66 KV (220 KV) Kukma Substation to Proposed 66 KV of Executive Engineer, Salinity Control Division Bhuj with 630 Sq.mm (3+1) is an approved power project in Sapeda, Anjar, Kachchh, Gujarat. The site covers 0.3 acres. Its stated project cost is ₹30 lakh. As of 27 Nov 2026, its status is “Forest land use approved” (since 29 Jul 2026).

See it on the live map All projects in Kachchh

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

66 KV Line from existing 66 KV (220 KV) Kukma Substation to Proposed 66 KV of Executive Engineer, Salinity Control Division Bhuj with 630 Sq.mm (3+1) is an approved power project in Sapeda, Anjar, Kachchh, Gujarat. The site covers 0.3 acres.

Who is building it?

The applicant is Gujarat Energy Transmission Corp LTD.

Has it been approved?

Yes. Its status is “Forest land use approved” (since 29 Jul 2026), as of 27 Nov 2026.

Where is it?

In Sapeda, Anjar, Kachchh, Gujarat.

How big is it?

It has a stated cost of ₹30 lakh; a site of 0.3 acres and 1,280 m² of forest land.

When was it filed?

The application was filed on 11 Oct 2025.

Project details

StatusForest land use approved
Status since29 Jul 2026
Application filed11 Oct 2025
Approval soughtForest land use
Application typeNew project
SectorPower
ApplicantGujarat Energy Transmission Corp LTD
Land area1,300 m²
Forest land1,280 m²
Project cost₹30 lakh
Village / localitySapeda
Taluk / tehsilAnjar
DistrictKachchh
StateGujarat
Location fromSite area on record
Our referenceWID-GJ-13007

In context

75 applications in Kachchh since January 2022 are in the same category (Power): 30 approved, 30 filed or under review, and 11 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 0.3 acres, this one is smaller than 78% of them.

1 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Sapeda, Anjar, Kachchh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Gujarat Energy Transmission Corp LTD in Kachchh

43 Gujarat Energy Transmission Corp projects in Kachchh
All 231 Gujarat Energy Transmission Corp projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.