Quick answers
What is this project?
Diversion of Protected Forest Land for widening of Sayan – Kadarma Road from Ch. Km. 0+000 to Ch. Km. 01+300 in Ta. Kim Dist. Surat is a lapsed road project in Sayan (Ct), Olpad, Surat, Gujarat. The site covers 2.3 acres.
Who is building it?
The applicant is Executive Engineer.
Has it been approved?
No. The application was lapsed on 29 Sept 2026, so it is no longer under consideration.
Where is it?
In Sayan (Ct), Olpad, Surat, Gujarat.
How big is it?
It has a stated cost of ₹7.2 crore; a site of 2.3 acres and 2.3 acres (0.9 ha) of forest land.
When was it filed?
The application was filed on 7 Feb 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 29 Sept 2026 |
| Application filed | 7 Feb 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Executive Engineer |
| Land area | 2.3 acres (0.9 ha) |
| Forest land | 2.3 acres (0.9 ha) |
| Project cost | ₹7.2 crore |
| Village / locality | Sayan (Ct) |
| Taluk / tehsil | Olpad |
| District | Surat |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-13049 |
In context
59 applications in Surat since January 2022 are in the same category (Roads & highways): 13 approved, 30 filed or under review, and 16 withdrawn, lapsed or rejected. The approved ones took a median of 12 months from filing to approval. At 2.3 acres, this one is smaller than 62% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sayan (Ct), Olpad, Surat, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of Protected Forest Land for widening of Sayan – Kareli – Mulad Road… — lapsed, 900 m away
- Widening and Strengthening of Delad Patiya to Vasavri Road Km 312/900 to… — more information requested, 1.9 km away
- Aug. Variyav RWSS ph-2 — lapsed, 4.5 km away
- : Diversion of 0. 0.9016 Ha. of Protected Forest Land for Laying 125 Mm Dia.… — lapsed, 4.8 km away
- Diversion of 0.1856 ha. Protected Forest land for the grant permission for… — lapsed, 5.3 km away
- Road work from widening work from subgrade to wearing course as per MoRTH 2013… — lapsed, 5.4 km away
- Nilkanth — environmental approval granted, 6.8 km away
- Kailash Avenue — environmental approval granted, 6.9 km away
More from Executive Engineer in Surat
- Diversion of 34.6289 Ha. of Forest Land for Widening and Strengthening of… — under forest review
- Diversion of 31.5581 Hectare of Forest Land for Widening and Strengthening of… — under forest review
- Diversion of 0.90 Ha of Protected Forest Land for Widening and Strengthening… — more information requested
- Diversion of Protected Forest Land for widening of Umarpada - Ghata Road (ODR)… — more information requested
- Traffic safety improvement at the existing Vadoli Main Road × Kim Road junction — more information requested
- Diversion of Protected Forest Land for Widening to connect proposed bridge on… — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.