Diversion of Road-Side Protected Forest Land of Mothada-Kothara Road for Lying of 66 KV, 2r* 1c*630 Sq Mm Underground Power Cable is an approved power project in Mothala, Abdasa, Kachchh, Gujarat. The site covers 0.2 acres.
Who is building it?
The applicant is Gujarat Energy Transmission Corp LTD.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 12 May 2025), as of 27 Nov 2026.
Where is it?
In Mothala, Abdasa, Kachchh, Gujarat.
How big is it?
It has a stated cost of ₹7 lakh; a site of 0.2 acres and 850 m² of forest land.
When was it filed?
The application was filed on 6 Mar 2025.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 12 May 2025 |
| Application filed | 6 Mar 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Gujarat Energy Transmission Corp LTD |
| Land area | 900 m² |
| Forest land | 850 m² |
| Project cost | ₹7 lakh |
| Village / locality | Mothala |
| Taluk / tehsil | Abdasa |
| District | Kachchh |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-13822 |
In context
75 applications in Kachchh since January 2022 are in the same category (Power): 30 approved, 30 filed or under review, and 11 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 0.2 acres, this one is smaller than 81% of them.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mothala, Abdasa, Kachchh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 0.3795 Ha Protected Forest Land for Laying of Proposed… — lapsed, 2.3 km away
- Diversion of Protected Forest Land for the Laying of Underground Water Pipeline — forest land use approved, 2.3 km away
- Laying of Underground Drinking Water Pipeline Through the Roadside Protected… — more information requested, 3 km away
- Diversion of Forest land for the laying of Proposed Underground Water Pipeline… — lapsed, 4.3 km away
- Diversion of Protected Forest Land for widening on Deshalpar – Nalia Road… — lapsed, 4.4 km away
- Diversion of Protected Forest Land for Widening of Kera - Naredi - Mothala… — more information requested, 4.5 km away
- Diversion of 13.11 Ha Reserve forest land for 400kV D/C Bhachunda - Varsana… — under forest review, 5.8 km away
- Rata Talab Bauxite Mine Project with production of 1,10, 022 TPA Bauxite ROM… — initial checks, 6.1 km away
More from Gujarat Energy Transmission Corp LTD in Kachchh
- Clearance of land In Wild Ass Sanctuary (Raising/Shifting of Existing 220 KV… — under wildlife review
- 66 kV S/C Transmission Line from 66 kV Rapar Substation to 66 kV Balasar… — more information requested
- Permission for Diversion of 0.1001 Ha Forest land of Karmata Village, Ta:… — more information requested
- Diversion of forest area of Vira Village, Ta: Anjar, Dist: Kutch for… — more information requested
- Diversion of 13.11 Ha Reserve forest land for 400kV D/C Bhachunda - Varsana… — under forest review
- Permission for Diversion of 0.4106 Ha Roadside Protected Forest land of… — more information requested
43 Gujarat Energy Transmission Corp projects in Kachchh
All 231 Gujarat Energy Transmission Corp projects across India
About this information