Quick answers
What is this project?
Laying of 132 Kv EHV Transmission line for commercial consumer GMRCL Metro is an approved building project in Gandhinagar (Nac), Gandhinagar, Gujarat. The site covers 2.1 acres.
Who is building it?
The applicant is Torrent Power LTD.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 1 May 2026), as of 27 Nov 2026.
Where is it?
In Gandhinagar (Nac), Gandhinagar, Gujarat.
How big is it?
It has a stated cost of ₹56 crore; a site of 2.1 acres and 2 acres (0.8 ha) of forest land.
When was it filed?
The application was filed on 31 Aug 2023.
Project details
| Official title | Laying of 132 Kv EHV Transmission line for commercial consumer GMRCL Metro in district Gandhinagar. |
|---|---|
| Status | Forest land use approved |
| Status since | 1 May 2026 |
| Application filed | 31 Aug 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Torrent Power LTD |
| Land area | 2.1 acres (0.8 ha) |
| Forest land | 2 acres (0.8 ha) |
| Project cost | ₹56 crore |
| Village / locality | Gandhinagar (Nac) |
| Taluk / tehsil | Gandhinagar |
| District | Gandhinagar |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-13362 |
In context
472 applications in Gandhinagar since January 2022 are in the same category (Buildings & townships): 365 approved, 79 filed or under review, and 28 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 2.1 acres, this one is larger than 76% of them.
136 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Gandhinagar (Nac), Gandhinagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Office Building Including annex building and development of bulk services for… — environmental approval granted, 200 m away
- Development of Land as Parking Plot near Sector-01 Metro Station — lapsed, 850 m away
- Diversion of 14.4918 Ha of Protected Forest Land for Development and… — under forest review, 900 m away
- Jio Digital Fibre Pvt. Ltd. Laying of OFC line GMC GIL Police Bhanvan CHH road… — forest land use approved, 1 km away
- Approach road for Civil Hospital on Gh Road Gandhinagar — forest land use approved, 1 km away
- Diversion of Forest Land for the Non-Forest Purpose Construction &… — lapsed, 1.1 km away
- Installation and Laying of New Fiber Connectivity at Ru Location Connecting… — lapsed, 1.2 km away
- Diversion of 11.7918 Ha of Protected Forest Land for Development and… — under forest review, 1.2 km away
More from Torrent Power LTD in Gandhinagar
- Laying of Underground 33 KV Ehv Power Cable (Transmission Line) for Kolavada… — forest land use approved
All 28 Torrent Power projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.