Quick answers
What is this project?
Jio Digital Fibre Pvt. Ltd. Laying of OFC line GMC GIL Police Bhanvan CHH road Forest Division Gandhinagar Diversion Ha. 0.0297 / Km. 0.660 Dist. Gandhinagar (PF area) and NPF area Police Bhavan Road Ha. 0.0082 / Km. 0.182 is an approved telecom project in Gandhinagar (Nac), Gandhinagar, Gujarat. The site covers 0.1 acres.
Who is building it?
The applicant is Jio Digital Fiber Private Limited.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 23 Jul 2026), as of 27 Nov 2026.
Where is it?
In Gandhinagar (Nac), Gandhinagar, Gujarat.
How big is it?
It has a stated cost of ₹2 lakh; a site of 0.1 acres and 300 m² of forest land.
When was it filed?
The application was filed on 8 Jul 2026.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 23 Jul 2026 |
| Application filed | 8 Jul 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Jio Digital Fiber Private Limited |
| Land area | 400 m² |
| Forest land | 300 m² |
| Project cost | ₹2 lakh |
| Village / locality | Gandhinagar (Nac) |
| Taluk / tehsil | Gandhinagar |
| District | Gandhinagar |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-13275 |
In context
14 applications in Gandhinagar since January 2022 are in the same category (Telecom): 5 approved, 1 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 2.4 years from filing to approval. At 0.1 acres, this one is smaller than 86% of them.
91 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Gandhinagar (Nac), Gandhinagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Design, Supply, Installation, Integration, Commission, Operations and… — lapsed, 400 m away
- Installation and Laying of New Fiber Connectivity at Ru Location Connecting… — lapsed, 450 m away
- Diversion of Forest Land for the Non-Forest Purpose Construction &… — lapsed, 650 m away
- Office Building Including annex building and development of bulk services for… — environmental approval granted, 900 m away
- Diversion of Forest Land (Area - 19.9168 Ha) for Non-Forest Purposes for the… — under forest review, 950 m away
- Laying of 132 Kv EHV Transmission line for commercial consumer GMRCL Metro — forest land use approved, 1 km away
- Diversion of 4.9206 ha. Protected Forest Land for construction of elevated… — lapsed, 1.2 km away
- Diversion of 4.9206 ha. Protected Forest Land for construction of elevated… — forest land use approved, 1.4 km away
All 787 Jio Digital Fibre projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.