Project details
| Status | Forest land use approved |
|---|---|
| Status since | 19 Aug 2026 |
| Application filed | 9 Mar 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Kpi Green Energy Limited |
| Land area | 2 acres (0.8 ha) |
| Forest land | 2 acres (0.8 ha) |
| Project cost | ₹21 lakh |
| Village / locality | Achhalia |
| Taluk / tehsil | Jhagadia |
| District | Bharuch |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-13460 |
In context
51 applications in Bharuch since January 2022 are in the same category (Power): 31 approved, 10 filed or under review, and 10 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 2 acres, this one is larger than 68% of them.
28 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Achhalia, Jhagadia, Bharuch, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- FCA proposal for Diversion of Forest land 0.7495 for laying Power Transmission… — lapsed, 350 m away
- Industrial project by M/s. Shreenath Silica — environmental approval granted, 3.1 km away
- M/S. Rajpardi Quarry Works Re-appraisal Area-1.53.31 Survey no. - 20/21 Paiki… — lapsed, 3.4 km away
- Solar Park - Diversion Area 0.0030 Ha. Laying 33KV 4-Nos electric cable line… — more information requested, 3.4 km away
- M/s Gokul Stone Quarry, C/O Shaileshbhai J Patel.Reapprasial… — environmental approval granted, 3.7 km away
- Mining project by M/s. Surbhi Minerals — environmental approval granted, 3.7 km away
- Mining project by M/s. Riya Minerals — under environmental review, 3.7 km away
- Shri Bhupendrabhai Thakorlal Rana Re-appraisal Area-0.85.50 Survey no. - 12… — environmental approval granted, 3.8 km away
More from Kpi Green Energy Limited in Bharuch
- Solar Park - Diversion Area 0.0030 Ha. Laying 33KV 4-Nos electric cable line… — more information requested
- FCA proposal - Diversion of Protected Forest Area 0.0956 Ha solar power… — in-principle approval, conditions pending
- Fca Proposal Permission for Diversion of Protected Forest Bare Minimum Area… — forest land use approved
- Request Protected Forest permission for area 0.0028 Ha. KPI Solar Park… — forest land use approved
- Diversion of Protected Forest area 0.2764 Ha Laying transmission power line… — forest land use approved
- Diversion of Forest Area – 0.0840 Ha. Permission for laying 33 KV 5-nos.… — forest land use approved
26 Kpi Green Energy projects in Bharuch
All 37 Kpi Green Energy projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.