Project details
| Status | Forest land use approved |
|---|---|
| Status since | 4 Jun 2026 |
| Application filed | 27 Mar 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Kpi Green Energy Limited |
| Land area | 800 m² |
| Forest land | 840 m² |
| Project cost | ₹11 lakh |
| Village / locality | Pisad |
| Taluk / tehsil | Vagra |
| District | Bharuch |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-13437 |
In context
51 applications in Bharuch since January 2022 are in the same category (Power): 31 approved, 10 filed or under review, and 10 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 0.2 acres, this one is smaller than 85% of them.
160 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Pisad, Vagra, Bharuch, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to ONGC Plans 78 Oil and Gas Wells in Bharuch, Gujarat (3.6 km away).
Other projects nearby
- Proposed Project for manufacturing of Dyes & Dye Intermediates and Pigment by… — environmental approval granted, 2.6 km away
- Industrial project by M/s. R.P. Intermediates Pvt. Ltd. — environmental approval granted, 2.6 km away
- Industrial project by M/s. R.P. Intermediates Pvt. Ltd. — cleared for impact study, 2.6 km away
- Industrial project by M/S. Aron Universal Limited — environmental approval granted, 2.6 km away
- Industrial project by M/S. Aron Universal Limited — cleared for impact study, 2.6 km away
- Dyes & Dyes Intermediates Manufacturing and Formulation Unit (430 TPM) — environmental approval granted, 2.6 km away
- Industrial project by M/s. Sainath Industries — environmental approval granted, 2.7 km away
- Industrial project by M/s. Sainath Industries — cleared for impact study, 2.7 km away
More from Kpi Green Energy Limited in Bharuch
- Solar Park - Diversion Area 0.0030 Ha. Laying 33KV 4-Nos electric cable line… — more information requested
- FCA proposal - Diversion of Protected Forest Area 0.0956 Ha solar power… — in-principle approval, conditions pending
- Fca Proposal Permission for Diversion of Protected Forest Bare Minimum Area… — forest land use approved
- Request Protected Forest permission for area 0.0028 Ha. KPI Solar Park… — forest land use approved
- Diversion of Protected Forest area 0.2764 Ha Laying transmission power line… — forest land use approved
- FCA proposal to set up Solar Park Rajpardi, District Bharuch - Proposed… — forest land use approved
26 Kpi Green Energy projects in Bharuch
All 37 Kpi Green Energy projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.