Quick answers
What is this project?
Diversion Roadside Protected Forest Land for the Construction of Approach Road is an approved road project in Dhaneti, Bhuj, Kachchh, Gujarat. The site covers 0.1 acres.
Who is building it?
The applicant is Shree Ram Minerals Private Limited.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 2 Sept 2024), as of 27 Nov 2026.
Where is it?
In Dhaneti, Bhuj, Kachchh, Gujarat.
How big is it?
It has a stated cost of ₹7 lakh; a site of 0.1 acres and 600 m² of forest land.
When was it filed?
The application was filed on 2 May 2023.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 2 Sept 2024 |
| Application filed | 2 May 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Shree Ram Minerals Private Limited |
| Land area | 600 m² |
| Forest land | 600 m² |
| Project cost | ₹7 lakh |
| Village / locality | Dhaneti |
| Taluk / tehsil | Bhuj |
| District | Kachchh |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-14192 |
In context
76 applications in Kachchh since January 2022 are in the same category (Roads & highways): 23 approved, 32 filed or under review, and 19 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 0.1 acres, this one is smaller than 68% of them.
111 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Dhaneti, Bhuj, Kachchh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Xtron Industries — under environmental review, 1.1 km away
- laying of Underground Water pipeline Parrallel to Bhuj Bhachau and Bhuj Anjar… — forest land use approved, 1.1 km away
- 8" Steel Gas Pipeline Connectivity from BK to Dwarkesh Petroleum Ta: Bhuj Dist… — forest land use approved, 1.3 km away
- Diversion Roadside Protected Forest land for the laying of Underground Water… — forest land use approved, 1.3 km away
- 63/125 MM Dia PE Gas Pipeline For Catering Domestic, Commercial & Industrial… — forest land use approved, 1.4 km away
- Construction of Approach Road Through the Roadside Protected Forest — forest land use approved, 1.5 km away
- Approach Roads for Survery No. 741/13 and Survey No. 457 of Village: Paddhar,… — forest land use approved, 1.7 km away
- "EC Application under Para 7(ii) for Carbon Black Manufacturing Facility (from… — environmental approval granted, 2.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.