Quick answers
What is Approach Access Road?
Approach Access Road is a lapsed road project in Jangi, Bhachau, Kachchh, Gujarat. The site covers 2.1 acres.
Who is building it?
The applicant is Powerica Limited.
Has it been approved?
No. The application was lapsed on 5 Jan 2025, so it is no longer under consideration.
Where is it?
In Jangi, Bhachau, Kachchh, Gujarat.
How big is it?
It has a stated cost of ₹2 lakh; a site of 2.1 acres and 2.1 acres (0.8 ha) of forest land.
When was it filed?
The application was filed on 16 Sept 2023.
Project details
| Status | Lapsed |
|---|---|
| Status since | 5 Jan 2025 |
| Application filed | 16 Sept 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Powerica Limited |
| Land area | 2.1 acres (0.8 ha) |
| Forest land | 2.1 acres (0.8 ha) |
| Project cost | ₹2 lakh |
| Village / locality | Jangi |
| Taluk / tehsil | Bhachau |
| District | Kachchh |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-14277 |
In context
76 applications in Kachchh since January 2022 are in the same category (Roads & highways): 23 approved, 32 filed or under review, and 19 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 2.1 acres, this one is larger than 55% of them.
Where it is
Jangi, Bhachau, Kachchh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Captive Jetty for Handling of salt &Other Commodities near Village Bagasara,… — lapsed, 9.2 km away
- Veer Chemical — lapsed, 12.1 km away
- Proposed expansion of Secondary Metallurgical Project by Haq Steels and… — environmental approval granted, 12.8 km away
- Proposed expansion of Secondary Metallurgical Project by Haq Steels and… — environmental approval granted, 12.8 km away
- Approach Road for the Approach Access for Our Proposed Fuel Station — forest land use approved, 12.9 km away
- Proposed expansion of Metallurgical Plant with CPP [by waste heat Recovery… — more information requested, 12.9 km away
- Proposed expansion of Metallurgical Plant with CPP [by waste heat Recovery… — cleared for impact study, 12.9 km away
- Proposed Expansion of Synthetic Organic Chemicals Manufacturing Unit by M/s… — environmental approval granted, 13.2 km away
All 4 Powerica projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.