Quick answers
What is this project?
66 KV S/C line from existing 66 KV Rapar Substation to 66 KV Balasar with ACSR Panther conductor is a proposed power project in Kadol, Bhachau, Kachchh, Gujarat. The site covers 42.7 acres.
Who is building it?
The applicant is Gujarat Energy Transmission Corp LTD.
Has it been approved?
Not yet. The application is still under review: its status is “Under wildlife review”, as of 27 Nov 2026.
Where is it?
In Kadol, Bhachau, Kachchh, Gujarat.
How big is it?
It has a stated cost of ₹18 crore and a site of 42.7 acres.
When was it filed?
The application was filed on 30 Nov 2025.
Project details
| Official title | 66 KV S/C line from existing 66 KV Rapar Substation to 66 KV Balasar with ACSR Panther conductor under R&M Scheme. |
|---|---|
| Status | Under wildlife review |
| Status since | 30 Nov 2025 |
| Application filed | 30 Nov 2025 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Power |
| Applicant | Gujarat Energy Transmission Corp LTD |
| Land area | 42.7 acres (17.3 ha) |
| Project cost | ₹18 crore |
| Village / locality | Kadol |
| Taluk / tehsil | Bhachau |
| District | Kachchh |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-14656 |
In context
75 applications in Kachchh since January 2022 are in the same category (Power): 30 approved, 30 filed or under review, and 11 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 42.7 acres, this one is larger than 64% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kadol, Bhachau, Kachchh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Manfara TE to Ramvav TE 24F OFC BSNL Route — lapsed, 3.4 km away
- Diversion of Kutch Desert Wildlife Sanctuary's Area for Construction of… — more information requested, 4.3 km away
- Shri Dhruvpalsinh Dharmendrasinh Jadeja — under environmental review, 5.1 km away
- Permission for Diversion of 0.4106 Ha Roadside Protected Forest land of… — more information requested, 5.3 km away
- Shri Sonara Madeva Haribhai — environmental approval granted, 5.5 km away
- Shri Sonara Madeva Haribhai — environmental approval granted, 5.6 km away
- Shri Shaileshkumar P Khandeka — more information requested, 5.9 km away
- Shri Pratipalsinh Jadeja — environmental approval granted, 6.3 km away
More from Gujarat Energy Transmission Corp LTD in Kachchh
- Clearance of land In Wild Ass Sanctuary (Raising/Shifting of Existing 220 KV… — under wildlife review
- 66 kV S/C Transmission Line from 66 kV Rapar Substation to 66 kV Balasar… — more information requested
- Permission for Diversion of 0.1001 Ha Forest land of Karmata Village, Ta:… — more information requested
- Diversion of forest area of Vira Village, Ta: Anjar, Dist: Kutch for… — more information requested
- Diversion of 13.11 Ha Reserve forest land for 400kV D/C Bhachunda - Varsana… — under forest review
- Permission for Diversion of 0.4106 Ha Roadside Protected Forest land of… — more information requested
43 Gujarat Energy Transmission Corp projects in Kachchh
All 231 Gujarat Energy Transmission Corp projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.