What is this project?
Expansion of Grain based Ethanol Plant from 300 KLPD to 450 KLPD by M/s E20 Greenfuels Private Limited is a lapsed industrial project in Panniwali Ruldu, Dabwali, Sirsa, Haryana. The site covers 24.7 acres.
Who is building it?
The applicant is E20 Greenfuels Private Limited.
Has it been approved?
No. The application was lapsed on 9 Mar 2026, so it is no longer under consideration.
Where is it?
In Panniwali Ruldu, Dabwali, Sirsa, Haryana.
How big is it?
It has a stated cost of ₹280 crore and a site of 24.7 acres.
When was it filed?
The application was filed on 8 Apr 2025.
Project details
| Official title | Expansion of Grain based Ethanol Plant from 300 KLPD to 450 KLPD along with 7.0 MW Cogeneration Power Plant at Village Panniwala Ruldu, Tehsil Dabwali, District Sirsa, Haryana by M/s E20 Greenfuels Private Limited |
|---|---|
| Status | Lapsed |
| Status since | 9 Mar 2026 |
| Application filed | 8 Apr 2025 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | E20 Greenfuels Private Limited |
| Land area | 24.7 acres (10 ha) |
| Project cost | ₹280 crore |
| Village / locality | Panniwali Ruldu |
| Taluk / tehsil | Dabwali |
| District | Sirsa |
| State | Haryana |
| Location from | Site boundary on record |
| Our reference | WID-HR-00671 |
In context
55 applications in Sirsa since January 2022 are in the same category (Industry): 7 approved, 20 filed or under review, and 28 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 24.7 acres, this one is larger than 98% of them.
8 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Panniwali Ruldu, Dabwali, Sirsa, Haryana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Grain Based Ethanol Plant From 300 Klpd to 420 Klpd by… — initial checks, 0 m away
- Expansion of Grain Based Ethanol Plant From 300 Klpd to 420 Klpd by… — initial checks, 0 m away
- Expansion of Grain Based Ethanol Plant From 300 Klpd to 420 Klpd by… — initial checks, 0 m away
- Diversion of forest land for approach access to the proposed site of M/s… — lapsed, 50 m away
- For access to Dharamkanta situated on Kalanwali to Dabwali road (MDR-101-A) km… — lapsed, 150 m away
- Estimate for Up Gradation of Water Supply Scheme and Construction of Boosting… — lapsed, 2.2 km away
- For Laying of 700mm i/d DI Rising Main from water work Panniwala Ruldu to… — lapsed, 3.1 km away
- M/s Sapphire Infra (For Industry), NH-09, Mandi Dabwali to Sirsa Road, at… — lapsed, 4.3 km away
More from E20 Greenfuels Private Limited in Sirsa
- Diversion of forest land for approach access to the proposed site of M/s… — lapsed
- Expansion of Grain Based Ethanol Plant From 300 Klpd to 420 Klpd by… — initial checks
- Expansion of Grain Based Ethanol Plant From 300 Klpd to 420 Klpd by… — initial checks
- Expansion of Grain Based Ethanol Plant From 300 Klpd to 420 Klpd by… — initial checks
All 5 E20 Greenfuels projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.