What is Developing? Open the mapMap

LapsedIndustry · Sirsa, Haryana

Expansion of Grain based Ethanol Plant from 300 KLPD to 450 KLPD by M/s E20 Greenfuels Private Limited

Expansion of Grain based Ethanol Plant from 300 KLPD to 450 KLPD by M/s E20 Greenfuels Private Limited is a lapsed industrial project in Panniwali Ruldu, Dabwali, Sirsa, Haryana. The site covers 24.7 acres. Its stated project cost is ₹280 crore. As of 27 Nov 2026, its status is “Lapsed” (since 9 Mar 2026).

See it on the live map All projects in Sirsa

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Expansion of Grain based Ethanol Plant from 300 KLPD to 450 KLPD by M/s E20 Greenfuels Private Limited is a lapsed industrial project in Panniwali Ruldu, Dabwali, Sirsa, Haryana. The site covers 24.7 acres.

Who is building it?

The applicant is E20 Greenfuels Private Limited.

Has it been approved?

No. The application was lapsed on 9 Mar 2026, so it is no longer under consideration.

Where is it?

In Panniwali Ruldu, Dabwali, Sirsa, Haryana.

How big is it?

It has a stated cost of ₹280 crore and a site of 24.7 acres.

When was it filed?

The application was filed on 8 Apr 2025.

Project details

Official titleExpansion of Grain based Ethanol Plant from 300 KLPD to 450 KLPD along with 7.0 MW Cogeneration Power Plant at Village Panniwala Ruldu, Tehsil Dabwali, District Sirsa, Haryana by M/s E20 Greenfuels Private Limited
StatusLapsed
Status since9 Mar 2026
Application filed8 Apr 2025
Approval soughtEnvironmental approval
Application typeExpansion
SectorIndustry
ApplicantE20 Greenfuels Private Limited
Land area24.7 acres (10 ha)
Project cost₹280 crore
Village / localityPanniwali Ruldu
Taluk / tehsilDabwali
DistrictSirsa
StateHaryana
Location fromSite boundary on record
Our referenceWID-HR-00671

In context

55 applications in Sirsa since January 2022 are in the same category (Industry): 7 approved, 20 filed or under review, and 28 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 24.7 acres, this one is larger than 98% of them.

8 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Panniwali Ruldu, Dabwali, Sirsa, Haryana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from E20 Greenfuels Private Limited in Sirsa

All 5 E20 Greenfuels projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.