Quick answers
What is this project?
Expansion of Grain Based Ethanol Plant From 300 Klpd to 420 Klpd by Modernization in Fermentation Technology and Change in Process Parameter to Achieve Higher Alcohol Production Within the Existing Plant by M/S. E20 Greenfuels Private Limited is a proposed fuel station in Haibuwana, Dabwali, Sirsa, Haryana. The site covers 24.7 acres.
Who is building it?
The applicant is E20 Greenfuels Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Haibuwana, Dabwali, Sirsa, Haryana.
How big is it?
It has a stated cost of ₹193 crore and a site of 24.7 acres.
When was it filed?
The application was filed on 13 Oct 2025.
Project details
| Status | Initial checks |
|---|---|
| Status since | 13 Oct 2025 |
| Application filed | 13 Oct 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | E20 Greenfuels Private Limited |
| Land area | 24.7 acres (10 ha) |
| Project cost | ₹193 crore |
| Village / locality | Haibuwana |
| Taluk / tehsil | Dabwali |
| District | Sirsa |
| State | Haryana |
| Location from | Site boundary on record |
| Our reference | WID-HR-00709 |
In context
58 applications in Sirsa since January 2022 are in the same category (Fuel stations): 45 approved, 4 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 24.7 acres, this one is larger than 98% of them.
8 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Haibuwana, Dabwali, Sirsa, Haryana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Grain Based Ethanol Plant From 300 Klpd to 420 Klpd by… — initial checks, 0 m away
- Expansion of Grain Based Ethanol Plant From 300 Klpd to 420 Klpd by… — initial checks, 0 m away
- Expansion of Grain based Ethanol Plant from 300 KLPD to 450 KLPD by M/s E20… — lapsed, 0 m away
- Diversion of forest land for approach access to the proposed site of M/s… — lapsed, 50 m away
- For access to Dharamkanta situated on Kalanwali to Dabwali road (MDR-101-A) km… — lapsed, 150 m away
- Estimate for Up Gradation of Water Supply Scheme and Construction of Boosting… — lapsed, 2.2 km away
- For Laying of 700mm i/d DI Rising Main from water work Panniwala Ruldu to… — lapsed, 3.1 km away
- M/s Sapphire Infra (For Industry), NH-09, Mandi Dabwali to Sirsa Road, at… — lapsed, 4.3 km away
More from E20 Greenfuels Private Limited in Sirsa
- Diversion of forest land for approach access to the proposed site of M/s… — lapsed
- Expansion of Grain Based Ethanol Plant From 300 Klpd to 420 Klpd by… — initial checks
- Expansion of Grain Based Ethanol Plant From 300 Klpd to 420 Klpd by… — initial checks
- Expansion of Grain based Ethanol Plant from 300 KLPD to 450 KLPD by M/s E20… — lapsed
All 5 E20 Greenfuels projects across India