Expansion of Grain Based Ethanol Plant From 300 Klpd to 420 Klpd by Modernization in Fermentation Technology and Change in Process Parameter to Achieve Higher Alcohol Production Within the Existing Plant by M/S. E20 Greenfuels Private Limited

Expansion of Grain Based Ethanol Plant From 300 Klpd to 420 Klpd by Modernization in Fermentation Technology and Change in Process Parameter to Achieve Higher Alcohol Production Within the Existing Plant by M/S. E20 Greenfuels Private Limited is a proposed fuel station in Haibuwana, Dabwali, Sirsa, Haryana. The site covers 24.7 acres. Its stated project cost is ₹193 crore. As of 27 Nov 2026, its status is “Initial checks” (since 13 Oct 2025).

See it on the live map All projects in Sirsa

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Expansion of Grain Based Ethanol Plant From 300 Klpd to 420 Klpd by Modernization in Fermentation Technology and Change in Process Parameter to Achieve Higher Alcohol Production Within the Existing Plant by M/S. E20 Greenfuels Private Limited is a proposed fuel station in Haibuwana, Dabwali, Sirsa, Haryana. The site covers 24.7 acres.

Who is building it?

The applicant is E20 Greenfuels Private Limited.

Has it been approved?

Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.

Where is it?

In Haibuwana, Dabwali, Sirsa, Haryana.

How big is it?

It has a stated cost of ₹193 crore and a site of 24.7 acres.

When was it filed?

The application was filed on 13 Oct 2025.

Project details

StatusInitial checks
Status since13 Oct 2025
Application filed13 Oct 2025
Approval soughtEnvironmental approval
Application typeNew project
SectorFuel stations
ApplicantE20 Greenfuels Private Limited
Land area24.7 acres (10 ha)
Project cost₹193 crore
Village / localityHaibuwana
Taluk / tehsilDabwali
DistrictSirsa
StateHaryana
Location fromSite boundary on record
Our referenceWID-HR-00709

In context

58 applications in Sirsa since January 2022 are in the same category (Fuel stations): 45 approved, 4 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 24.7 acres, this one is larger than 98% of them.

8 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Haibuwana, Dabwali, Sirsa, Haryana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from E20 Greenfuels Private Limited in Sirsa

All 5 E20 Greenfuels projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.