What is this project?
Diversion of forest land for approach access to the proposed site of M/s E20Green Fuels Private Limited along Kalanwali-Dabwali Road (MDR-101A) KM Stone - 17.73 (L.H.S.) is a lapsed industrial project in Panniwali Ruldu, Dabwali, Sirsa, Haryana. The site covers 17.2 acres.
Who is building it?
The applicant is E20 Greenfuels Private Limited.
Has it been approved?
No. The application was lapsed on 5 Apr 2026, so it is no longer under consideration.
Where is it?
In Panniwali Ruldu, Dabwali, Sirsa, Haryana.
How big is it?
It has a stated cost of ₹30 lakh; a site of 17.2 acres and 240 m² of forest land.
When was it filed?
The application was filed on 8 Dec 2025.
Project details
| Official title | Diversion of forest land for approach access to the proposed site of M/s E20Green Fuels Private Limited along Kalanwali-Dabwali Road (MDR-101A) KM Stone - 17.73 (L.H.S.) situated at Village - Panniwala Ruldu, Tehsil - Dabwali, Distt- Sirsa (HR) |
|---|---|
| Status | Lapsed |
| Status since | 5 Apr 2026 |
| Application filed | 8 Dec 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Industry |
| Applicant | E20 Greenfuels Private Limited |
| Land area | 17.2 acres (7 ha) |
| Forest land | 240 m² |
| Project cost | ₹30 lakh |
| Village / locality | Panniwali Ruldu |
| Taluk / tehsil | Dabwali |
| District | Sirsa |
| State | Haryana |
| Location from | Site boundary on record |
| Our reference | WID-HR-02114 |
In context
55 applications in Sirsa since January 2022 are in the same category (Industry): 7 approved, 20 filed or under review, and 28 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 17.2 acres, this one is larger than 95% of them.
8 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Panniwali Ruldu, Dabwali, Sirsa, Haryana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Grain Based Ethanol Plant From 300 Klpd to 420 Klpd by… — initial checks, 50 m away
- Expansion of Grain Based Ethanol Plant From 300 Klpd to 420 Klpd by… — initial checks, 50 m away
- Expansion of Grain Based Ethanol Plant From 300 Klpd to 420 Klpd by… — initial checks, 50 m away
- Expansion of Grain based Ethanol Plant from 300 KLPD to 450 KLPD by M/s E20… — lapsed, 50 m away
- For access to Dharamkanta situated on Kalanwali to Dabwali road (MDR-101-A) km… — lapsed, 200 m away
- Estimate for Up Gradation of Water Supply Scheme and Construction of Boosting… — lapsed, 2.2 km away
- For Laying of 700mm i/d DI Rising Main from water work Panniwala Ruldu to… — lapsed, 3.1 km away
- M/s Sapphire Infra (For Industry), NH-09, Mandi Dabwali to Sirsa Road, at… — lapsed, 4.4 km away
More from E20 Greenfuels Private Limited in Sirsa
- Expansion of Grain Based Ethanol Plant From 300 Klpd to 420 Klpd by… — initial checks
- Expansion of Grain Based Ethanol Plant From 300 Klpd to 420 Klpd by… — initial checks
- Expansion of Grain Based Ethanol Plant From 300 Klpd to 420 Klpd by… — initial checks
- Expansion of Grain based Ethanol Plant from 300 KLPD to 450 KLPD by M/s E20… — lapsed
All 5 E20 Greenfuels projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.