Quick answers
What is this project?
Laying of underground Electric Cable for M/S Digi Drive from Sikanderpur Mod to M/S Digi Drive Private Limited along Prithla Dhatir road district Palwal is a lapsed road project in Parthala, Palwal, Haryana. The site covers 0.2 acres.
Who is building it?
The applicant is Yogiji Digi Private Limited.
Has it been approved?
No. The application was lapsed on 9 Aug 2023, so it is no longer under consideration.
Where is it?
In Parthala, Palwal, Haryana.
How big is it?
It has a site of 0.2 acres and 680 m² of forest land.
When was it filed?
The application was filed on 4 May 2023.
Project details
| Status | Lapsed |
|---|---|
| Status since | 9 Aug 2023 |
| Application filed | 4 May 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Yogiji Digi Private Limited |
| Land area | 700 m² |
| Forest land | 680 m² |
| Village / locality | Parthala |
| Taluk / tehsil | Palwal |
| District | Palwal |
| State | Haryana |
| Location from | Site boundary on record |
| Our reference | WID-HR-03498 |
In context
8 applications in Palwal since January 2022 are in the same category (Roads & highways): 1 approved, 4 filed or under review, and 3 withdrawn, lapsed or rejected.
23 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Parthala, Palwal, Haryana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- RETAIL OUTLET OF M/s HINDUSTAN PETROLEUM CORPORATION LTD." ON ODR ROAD… — forest land use approved, 900 m away
- Manufacturing of CRCA sheets and Steel Pipes by Prompt Enterprises PVT Ltd — environmental approval granted, 2.2 km away
- Manufacturing of CRCA sheets and Steel Pipes by Prompt Enterprises PVT Ltd — cleared for impact study, 2.2 km away
- ENVIRONMENTAL CLEARANCE FOR SETTING UP OF INDUSTRIAL UNIT (FERROUS AND NON-… — under environmental review, 2.3 km away
- Approach access for an Affordable Residential Plotted Colony under DDJAY on… — lapsed, 2.4 km away
- Proposed Integrated Manufacturing facility of Auto Components. — under environmental review, 3.1 km away
- Proposed expansion of existing Industrial Unit by M/s Knorr Bremse India… — environmental approval granted, 3.3 km away
- Diversion of 0.2038 Ha. of Forest Land for laying of PNG Pipeline on Village -… — lapsed, 3.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.