Project details
| Official title | Enhancement of M.S. Billet production from 24000TPA to 148,500TPA through2x15T Induction Furnaces (by replacing existing 1x8T Furnace with 1x15T & installing additional 2x15T Furnaces along with CCM – 2x2 strand), Slag Crusher from 4200TPA to 33,000TPA capacity and production of 145,500TPA TMT Bars & Rolled Products by installing Rolling Mills of 1X25TPH Capacity by M/s Pavanputra Steel and Alloys at Plot No. 57/B, Barhi Industrial Area, Village: Konra, P.S.: Barhi, District: Hazaribagh, Jharkha |
|---|---|
| Status | Environmental approval granted |
| Status since | 16 Nov 2022 |
| Application filed | 16 Nov 2022 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | Sneh Jain |
| Land area | 5.6 acres (2.3 ha) |
| Project cost | ₹49 crore |
| Village / locality | Konra (Ct) |
| Taluk / tehsil | Barhi |
| District | Hazaribagh |
| State | Jharkhand |
| Location from | Village |
| Our reference | WID-JH-00058 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Early planning filed 26 Nov 2022 | Cleared for impact study | 5.6 acres | ₹49 crore |
| Expansion filed 16 Nov 2022 (this page) | Environmental approval granted | 5.6 acres | ₹49 crore |
In context
14 applications in Hazaribagh since January 2022 are in the same category (Industry): 11 approved, 2 filed or under review, and 1 withdrawn, lapsed or rejected. At 5.6 acres, this one is smaller than 86% of them.
Where it is
Konra (Ct), Barhi, Hazaribagh, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Enhancement of MS Billet production from 28800TPA to 118800TPA through 3x12T… — cleared for impact study, 400 m away
- Enhancement of MS Billet production from 28800TPA to 118800TPA through 3x12T… — environmental approval granted, 400 m away
- Industrial project by M/s Radha Gopal Ispat LLP — environmental approval granted, 1 km away
- Enhancement of M.S. Billet production from 24000TPA to 148,500TPA through2x15T… — cleared for impact study, 1 km away
- Expansion of Existing 24600 TPA Billets Unit by addition of 2x12 T Induction… — environmental approval granted, 1.7 km away
- Enhancement of MS Billet production from 27,000 TPA to 188,100 TPA through… — environmental approval granted, 2.1 km away
- Enhancement of MS Billet production from 27,000 TPA to 188,100 TPA through… — cleared for impact study, 2.1 km away
- Dhab Salaunia Stone Deposit (1.28 ha.) — environmental approval granted, 6.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.