Project details
| Official title | Enhancement of MS Billet production from 28800TPA to 118800TPA through 3x12T Induction Furnaces (by existing 1x12T Furnace & installing additional 2x12T Furnaces along with CCM-1x2strand, Rad- 4/7), Slag Crusher from 3600 TPA to 30000 TPA capacity and production of 117600TPA TMT Bars & Rolled Products by installing Rolling Mill of 1x20TPH Capacity at Plot No. 57/C, Barhi Industrial Area, Village: Konra, P.S.: Barhi, District: Hazaribagh, Jharkhand. |
|---|---|
| Status | Environmental approval granted |
| Status since | 18 Sept 2023 |
| Application filed | 18 Sept 2023 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | Shresth Steel & Energy LLP |
| Land area | 5.4 acres (2.2 ha) |
| Project cost | ₹76.2 crore |
| Village / locality | Konra (Ct) |
| Taluk / tehsil | Barhi |
| District | Hazaribagh |
| State | Jharkhand |
| Location from | Site boundary on record |
| Our reference | WID-JH-00090 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Early planning filed 23 Nov 2023 | Cleared for impact study | 5.4 acres | ₹76.2 crore |
| Expansion filed 18 Sept 2023 (this page) | Environmental approval granted | 5.4 acres | ₹76.2 crore |
In context
14 applications in Hazaribagh since January 2022 are in the same category (Industry): 11 approved, 2 filed or under review, and 1 withdrawn, lapsed or rejected. At 5.4 acres, this one is smaller than 100% of them.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Konra (Ct), Barhi, Hazaribagh, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Enhancement of MS Billet production from 28800TPA to 118800TPA through 3x12T… — cleared for impact study, 0 m away
- Enhancement of M.S. Billet production from 24000TPA to 148,500TPA through2x15T… — environmental approval granted, 400 m away
- Industrial project by M/s Radha Gopal Ispat LLP — environmental approval granted, 700 m away
- Enhancement of M.S. Billet production from 24000TPA to 148,500TPA through2x15T… — cleared for impact study, 700 m away
- Expansion of Existing 24600 TPA Billets Unit by addition of 2x12 T Induction… — environmental approval granted, 1.4 km away
- Enhancement of MS Billet production from 27,000 TPA to 188,100 TPA through… — environmental approval granted, 1.8 km away
- Enhancement of MS Billet production from 27,000 TPA to 188,100 TPA through… — cleared for impact study, 1.8 km away
- Dhab Salaunia Stone Deposit (1.28 ha.) — environmental approval granted, 6.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.