Cleared for impact studyIndustry · Hazaribagh, Jharkhand

Enhancement of M.S. Billet production from 24000TPA to 148,500TPA through2x15T Induction Furnaces (by replacing existing 1x8T Furnace with 1x15T & installing additional 2x15T Furnaces

Enhancement of M.S. Billet production from 24000TPA to 148,500TPA through2x15T Induction Furnaces (by replacing existing 1x8T Furnace with 1x15T & installing additional 2x15T Furnaces is a proposed industrial project in Konra (Ct), Barhi, Hazaribagh, Jharkhand. The site covers 5.6 acres. Its stated project cost is ₹49 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 26 Nov 2022).

See it on the live map All projects in Hazaribagh

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Enhancement of M.S. Billet production from 24000TPA to 148,500TPA through2x15T Induction…

Project details

Official titleEnhancement of M.S. Billet production from 24000TPA to 148,500TPA through2x15T Induction Furnaces (by replacing existing 1x8T Furnace with 1x15T & installing additional 2x15T Furnaces along with CCM – 2x2 strand), Slag Crusher from 4200TPA to 33,000TPA capacity and production of 145,500TPA TMT Bars & Rolled Products by installing Rolling Mills of 1X25TPH Capacity by M/s Pavanputra Steel and Alloys at Plot No. 57/B, Barhi Industrial Area, Village: Konra, P.S.: Barhi, District: Hazaribagh, Jharkha
StatusCleared for impact study
Status since26 Nov 2022
Application filed26 Nov 2022
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantSneh Jain
Land area5.6 acres (2.3 ha)
Project cost₹49 crore
Village / localityKonra (Ct)
Taluk / tehsilBarhi
DistrictHazaribagh
StateJharkhand
Location fromSite boundary on record
Our referenceWID-JH-00078

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Early planning filed 26 Nov 2022 (this page)Cleared for impact study5.6 acres₹49 crore
Expansion filed 16 Nov 2022Environmental approval granted5.6 acres₹49 crore

In context

14 applications in Hazaribagh since January 2022 are in the same category (Industry): 11 approved, 2 filed or under review, and 1 withdrawn, lapsed or rejected. At 5.6 acres, this one is smaller than 86% of them.

6 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Konra (Ct), Barhi, Hazaribagh, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.