One of 2 filings for this project. The project's main page, with every filing and where each stands: Enhancement of MS Billet production from 27,000 TPA to 188,100 TPA through 3x15T…
Project details
| Official title | Enhancement of MS Billet production from 27,000 TPA to 188,100 TPA through 3x15T (proposed) & 1x12T (existing) Induction Furnaces along with CCM-1x2 Strand, Rad- 4/7), Slag Crusher from 15,000TPA to 45,000TPA capacity and production of 181,500 TPA TMT Bars & Rolled Products by installing Rolling Mill of capacity 550TPD by M/s Divine Steels Pvt Ltd At Plot No. 13/IA, Barhi Industrial Area, Village: Konra, P.S.: Barhi, District: Hazaribagh, Jharkhand |
|---|---|
| Status | Cleared for impact study |
| Status since | 17 Jul 2023 |
| Application filed | 17 Jul 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Divine Steels Private Limited |
| Land area | 12.3 acres (5 ha) |
| Project cost | ₹44.4 crore |
| Village / locality | Barhi (Ct) |
| Taluk / tehsil | Barhi |
| District | Hazaribagh |
| State | Jharkhand |
| Location from | Site boundary on record |
| Our reference | WID-JH-00380 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 24 May 2024 | Environmental approval granted | 12.3 acres | ₹44.4 crore |
| Early planning filed 17 Jul 2023 (this page) | Cleared for impact study | 12.3 acres | ₹44.4 crore |
In context
14 applications in Hazaribagh since January 2022 are in the same category (Industry): 11 approved, 2 filed or under review, and 1 withdrawn, lapsed or rejected. At 12.3 acres, this one is smaller than 57% of them.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Barhi (Ct), Barhi, Hazaribagh, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Enhancement of MS Billet production from 27,000 TPA to 188,100 TPA through… — environmental approval granted, 0 m away
- Expansion of Existing 24600 TPA Billets Unit by addition of 2x12 T Induction… — environmental approval granted, 500 m away
- Enhancement of M.S. Billet production from 24000TPA to 148,500TPA through2x15T… — cleared for impact study, 1.1 km away
- Industrial project by M/s Radha Gopal Ispat LLP — environmental approval granted, 1.1 km away
- Enhancement of MS Billet production from 28800TPA to 118800TPA through 3x12T… — cleared for impact study, 1.8 km away
- Enhancement of MS Billet production from 28800TPA to 118800TPA through 3x12T… — environmental approval granted, 1.8 km away
- Enhancement of M.S. Billet production from 24000TPA to 148,500TPA through2x15T… — environmental approval granted, 2.1 km away
- Dhab Salaunia Stone Deposit (1.28 ha.) — environmental approval granted, 8.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.