Quick answers
What is this project?
Expansion of Forging Unit of M/s Ramkrishna Forgings Limited (Unit – VII) from 18,600 to 100,000TPA and Fabrication & Assembly capacity 13,130TPA at Plot No. 1988, Industrial Area, Village- Dugni, Block- Seraikela, District- Seraikela Kharsawan, State- Jharkhand is a proposed industrial project in Dugni, Adityapur(Gamharia), Saraikela-Kharsawan, Jharkhand. The site covers 24 acres.
Who is building it?
The applicant is Ramkrishna Forgings Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 24 Apr 2023), as of 27 Nov 2026.
Where is it?
In Dugni, Adityapur(Gamharia), Saraikela-Kharsawan, Jharkhand.
How big is it?
It has a stated cost of ₹795.3 crore and a site of 24 acres.
When was it filed?
The application was filed on 24 Apr 2023.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Expansion of Forging Unit of M/s Ramkrishna Forgings Limited (Unit – VII) from 18,600 to…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 24 Apr 2023 |
| Application filed | 24 Apr 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Ramkrishna Forgings Limited |
| Land area | 24 acres (9.7 ha) |
| Project cost | ₹795.3 crore |
| Village / locality | Dugni |
| Taluk / tehsil | Adityapur(Gamharia) |
| District | Saraikela-Kharsawan |
| State | Jharkhand |
| Location from | Site boundary on record |
| Our reference | WID-JH-00128 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 13 Oct 2023 | Environmental approval granted | 24 acres | ₹795.3 crore |
| Early planning filed 24 Apr 2023 (this page) | Cleared for impact study | 24 acres | ₹795.3 crore |
In context
47 applications in Saraikela-Kharsawan since January 2022 are in the same category (Industry): 24 approved, 11 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 24 acres, this one is smaller than 60% of them.
11 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Dugni, Adityapur(Gamharia), Saraikela-Kharsawan, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Forging Unit of M/s Ramkrishna Forgings Limited (Unit – VII) from… — environmental approval granted, 0 m away
- Regularization of Existing Rolling mill, Multi blanking line (CTL), Reheating… — cleared for impact study, 2.2 km away
- Preliminary Exploration for Copper, Molybdenum, Gold Mineralisation in… — forest land use approved, 2.4 km away
- Preliminary Exploration for Copper, Molybdenum, Gold Mineralisation in… — lapsed, 2.4 km away
- Expansion in existing Steel Plant at vill- Maslewa, Kolabira,… — returned to applicant, 2.8 km away
- Expansion in existing Steel Plant at vill- Maslewa, Kolabira,… — returned to applicant, 2.8 km away
- Integrated Common Hazardous Waste Treatment, Storage and Disposal Facility — lapsed, 4.3 km away
- Inclusion of Common Bio-Medical Waste Treatment Facility in Hazardous Waste… — lapsed, 4.3 km away
More from Ramkrishna Forgings Limited in Saraikela-Kharsawan
- Expansion of Existing plant for Manufacturing of Grey, SG, CI and ADI Iron… — cleared for impact study
- Proposed Foundry Plant – VIII (Manufacturing of Grey, SG, CI & ADI Casting… — lapsed
All 4 Ramkrishna Forgings projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.