What is Developing? Open the mapMap

LapsedBuildings & townships · Saraikela-Kharsawan, Jharkhand

Proposed Foundry Plant – VIII (Manufacturing of Grey, SG, CI & ADI Casting Components) by M/s Ramkrishna Forgings Limited

Proposed Foundry Plant – VIII (Manufacturing of Grey, SG, CI & ADI Casting Components) by M/s Ramkrishna Forgings Limited is a lapsed building project in Baliguma, Adityapur(Gamharia), Saraikela-Kharsawan, Jharkhand. The site covers 19.8 acres. Its stated project cost is ₹173.4 crore. As of 27 Nov 2026, its status is “Lapsed” (since 29 Oct 2024).

See it on the live map All projects in Saraikela-Kharsawan

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Foundry Plant – VIII (Manufacturing of Grey, SG, CI & ADI Casting Components) by M/s Ramkrishna Forgings Limited is a lapsed building project in Baliguma, Adityapur(Gamharia), Saraikela-Kharsawan, Jharkhand. The site covers 19.8 acres.

Who is building it?

The applicant is Ramkrishna Forgings Limited.

Has it been approved?

No. The application was lapsed on 29 Oct 2024, so it is no longer under consideration.

Where is it?

In Baliguma, Adityapur(Gamharia), Saraikela-Kharsawan, Jharkhand.

How big is it?

It has a stated cost of ₹173.4 crore and a site of 19.8 acres.

When was it filed?

The application was filed on 21 Aug 2024.

Project details

Official titleProposed Foundry Plant – VIII (Manufacturing of Grey, SG, CI & ADI Casting Components) at Village Bholadih, P.O Kolabira, P.S Saraikela, District Saraikela Kharsawan, Jamshedpur, Jharkhand being developed by M/s Ramkrishna Forgings Limited.
StatusLapsed
Status since29 Oct 2024
Application filed21 Aug 2024
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantRamkrishna Forgings Limited
Land area19.8 acres (8 ha)
Project cost₹173.4 crore
Village / localityBaliguma
Taluk / tehsilAdityapur(Gamharia)
DistrictSaraikela-Kharsawan
StateJharkhand
Location fromSite boundary on record
Our referenceWID-JH-00941

In context

20 applications in Saraikela-Kharsawan since January 2022 are in the same category (Buildings & townships): 15 approved, 2 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 43 days from filing to approval. At 19.8 acres, this one is larger than 85% of them.

5 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Baliguma, Adityapur(Gamharia), Saraikela-Kharsawan, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Ramkrishna Forgings Limited in Saraikela-Kharsawan

All 4 Ramkrishna Forgings projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.