Quick answers
What is this project?
Proposed Foundry Plant – VIII (Manufacturing of Grey, SG, CI & ADI Casting Components) by M/s Ramkrishna Forgings Limited is a lapsed building project in Baliguma, Adityapur(Gamharia), Saraikela-Kharsawan, Jharkhand. The site covers 19.8 acres.
Who is building it?
The applicant is Ramkrishna Forgings Limited.
Has it been approved?
No. The application was lapsed on 29 Oct 2024, so it is no longer under consideration.
Where is it?
In Baliguma, Adityapur(Gamharia), Saraikela-Kharsawan, Jharkhand.
How big is it?
It has a stated cost of ₹173.4 crore and a site of 19.8 acres.
When was it filed?
The application was filed on 21 Aug 2024.
Project details
| Official title | Proposed Foundry Plant – VIII (Manufacturing of Grey, SG, CI & ADI Casting Components) at Village Bholadih, P.O Kolabira, P.S Saraikela, District Saraikela Kharsawan, Jamshedpur, Jharkhand being developed by M/s Ramkrishna Forgings Limited. |
|---|---|
| Status | Lapsed |
| Status since | 29 Oct 2024 |
| Application filed | 21 Aug 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Ramkrishna Forgings Limited |
| Land area | 19.8 acres (8 ha) |
| Project cost | ₹173.4 crore |
| Village / locality | Baliguma |
| Taluk / tehsil | Adityapur(Gamharia) |
| District | Saraikela-Kharsawan |
| State | Jharkhand |
| Location from | Site boundary on record |
| Our reference | WID-JH-00941 |
In context
20 applications in Saraikela-Kharsawan since January 2022 are in the same category (Buildings & townships): 15 approved, 2 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 43 days from filing to approval. At 19.8 acres, this one is larger than 85% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Baliguma, Adityapur(Gamharia), Saraikela-Kharsawan, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Existing plant for Manufacturing of Grey, SG, CI and ADI Iron… — cleared for impact study, 0 m away
- Expansion in existing Steel Plant at vill- Maslewa, Kolabira,… — returned to applicant, 2.6 km away
- Expansion in existing Steel Plant at vill- Maslewa, Kolabira,… — returned to applicant, 2.6 km away
- Chamaru Sand Ghat — under environmental review, 2.9 km away
- Regularization of Existing Rolling mill, Multi blanking line (CTL), Reheating… — cleared for impact study, 3.1 km away
- Expansion of Forging Unit of M/s Ramkrishna Forgings Limited (Unit – VII) from… — environmental approval granted, 5.1 km away
- Expansion of Forging Unit of M/s Ramkrishna Forgings Limited (Unit – VII) from… — cleared for impact study, 5.1 km away
- 0.5 MTPA Electrical Steel Complex — cleared for impact study, 5.2 km away
More from Ramkrishna Forgings Limited in Saraikela-Kharsawan
- Expansion of Existing plant for Manufacturing of Grey, SG, CI and ADI Iron… — cleared for impact study
- Expansion of Forging Unit of M/s Ramkrishna Forgings Limited (Unit – VII) from… — environmental approval granted
- Expansion of Forging Unit of M/s Ramkrishna Forgings Limited (Unit – VII) from… — cleared for impact study
All 4 Ramkrishna Forgings projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.