Quick answers
What is this project?
Regularization of Existing Rolling mill, Multi blanking line (CTL), Reheating furnace (11 TPH) for production of 28160 TPA Round Bars, Flat Bars & Sections and 20 million/year M.S. Blanks-Disc is a proposed industrial project in Muria, Adityapur(Gamharia), Saraikela-Kharsawan, Jharkhand. The site covers 8.7 acres.
Who is building it?
The applicant is Steel Strips Wheels LTD.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 19 Jun 2024), as of 27 Nov 2026.
Where is it?
In Muria, Adityapur(Gamharia), Saraikela-Kharsawan, Jharkhand.
How big is it?
It has a stated cost of ₹102.9 crore and a site of 8.7 acres.
When was it filed?
The application was filed on 27 May 2024.
Project details
| Official title | Regularization of Existing Rolling mill, Multi blanking line (CTL), Reheating furnace (11 TPH) for production of 28160 TPA Round Bars, Flat Bars & Sections and 20 million/year M.S. Blanks-Disc along with Modernization of existing Coal Gasifier by M/s Steel Strips Wheel Limited at Village- Muria, P.O. Kolabira, Dist.- Saraikela Kharsawan, Jharkhand |
|---|---|
| Status | Cleared for impact study |
| Status since | 19 Jun 2024 |
| Application filed | 27 May 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Steel Strips Wheels LTD |
| Land area | 8.7 acres (3.5 ha) |
| Project cost | ₹102.9 crore |
| Village / locality | Muria |
| Taluk / tehsil | Adityapur(Gamharia) |
| District | Saraikela-Kharsawan |
| State | Jharkhand |
| Location from | Site boundary on record |
| Our reference | WID-JH-00406 |
In context
47 applications in Saraikela-Kharsawan since January 2022 are in the same category (Industry): 24 approved, 11 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 8.7 acres, this one is smaller than 74% of them.
9 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Muria, Adityapur(Gamharia), Saraikela-Kharsawan, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion in existing Steel Plant at vill- Maslewa, Kolabira,… — returned to applicant, 1.5 km away
- Expansion in existing Steel Plant at vill- Maslewa, Kolabira,… — returned to applicant, 1.5 km away
- Expansion of Forging Unit of M/s Ramkrishna Forgings Limited (Unit – VII) from… — environmental approval granted, 2.2 km away
- Expansion of Forging Unit of M/s Ramkrishna Forgings Limited (Unit – VII) from… — cleared for impact study, 2.2 km away
- Preliminary Exploration for Copper, Molybdenum, Gold Mineralisation in… — forest land use approved, 2.6 km away
- Preliminary Exploration for Copper, Molybdenum, Gold Mineralisation in… — lapsed, 2.6 km away
- Chamaru Sand Ghat — under environmental review, 3 km away
- Expansion of Existing plant for Manufacturing of Grey, SG, CI and ADI Iron… — cleared for impact study, 3 km away
All 3 Steel Strips Wheels projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.