What is Developing? Open the mapMap

Returned to applicantIndustry · Saraikela-Kharsawan, Jharkhand

Expansion in existing Steel Plant at vill- Maslewa, Kolabira, Saraikela-Kharsawan (JHK)

Expansion in existing Steel Plant at vill- Maslewa, Kolabira, Saraikela-Kharsawan (JHK) is a proposed industrial project in Saldih, Adityapur(Gamharia), Saraikela-Kharsawan, Jharkhand. The site covers 63.7 acres. Its stated project cost is ₹441 crore. As of 27 Nov 2026, its status is “Returned to applicant” (since 15 Apr 2025).

See it on the live map All projects in Saraikela-Kharsawan

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Expansion in existing Steel Plant at vill- Maslewa, Kolabira, Saraikela-Kharsawan (JHK) is a proposed industrial project in Saldih, Adityapur(Gamharia), Saraikela-Kharsawan, Jharkhand. The site covers 63.7 acres.

Who is building it?

The applicant is D.D. Steel & Power Limited.

Has it been approved?

Not yet. The application is still under review: its status is “Returned to applicant”, as of 27 Nov 2026.

Where is it?

In Saldih, Adityapur(Gamharia), Saraikela-Kharsawan, Jharkhand.

How big is it?

It has a stated cost of ₹441 crore and a site of 63.7 acres.

When was it filed?

The application was filed on 22 Jan 2025.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Expansion in existing Steel Plant at vill- Maslewa, Kolabira, Saraikela-Kharsawan (JHK)

Project details

StatusReturned to applicant
Status since15 Apr 2025
Application filed22 Jan 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantD.D. Steel & Power Limited
Land area63.7 acres (25.8 ha)
Project cost₹441 crore
Village / localitySaldih
Taluk / tehsilAdityapur(Gamharia)
DistrictSaraikela-Kharsawan
StateJharkhand
Location fromSite boundary on record
Our referenceWID-JH-00676

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Early planning filed 17 May 2025Returned to applicant63.7 acres₹441 crore
Early planning filed 22 Jan 2025 (this page)Returned to applicant63.7 acres₹441 crore

In context

47 applications in Saraikela-Kharsawan since January 2022 are in the same category (Industry): 24 approved, 11 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 63.7 acres, this one is larger than 60% of them.

8 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Saldih, Adityapur(Gamharia), Saraikela-Kharsawan, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.