Quick answers
What is Chamaru Sand Ghat?
Chamaru Sand Ghat is a proposed mining project in Chamaru, Adityapur(Gamharia), Saraikela-Kharsawan, Jharkhand. The site covers 5.1 acres.
Who is building it?
The applicant is Pratik Hetamsaria.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Chamaru, Adityapur(Gamharia), Saraikela-Kharsawan, Jharkhand.
How big is it?
It has a stated cost of ₹40 lakh and a site of 5.1 acres.
When was it filed?
The application was filed on 10 Nov 2026.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 10 Nov 2026 |
| Application filed | 10 Nov 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Pratik Hetamsaria |
| Land area | 5.1 acres (2.1 ha) |
| Project cost | ₹40 lakh |
| Village / locality | Chamaru |
| Taluk / tehsil | Adityapur(Gamharia) |
| District | Saraikela-Kharsawan |
| State | Jharkhand |
| Location from | Site boundary on record |
| Our reference | WID-JH-02716 |
In context
44 applications in Saraikela-Kharsawan since January 2022 are in the same category (Mining): 33 approved, 4 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 5.1 acres, this one is larger than 50% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Chamaru, Adityapur(Gamharia), Saraikela-Kharsawan, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Foundry Plant – VIII (Manufacturing of Grey, SG, CI & ADI Casting… — lapsed, 2.9 km away
- Expansion of Existing plant for Manufacturing of Grey, SG, CI and ADI Iron… — cleared for impact study, 2.9 km away
- Regularization of Existing Rolling mill, Multi blanking line (CTL), Reheating… — cleared for impact study, 3 km away
- Preliminary Exploration for Copper, Molybdenum, Gold Mineralisation in… — forest land use approved, 3.9 km away
- Preliminary Exploration for Copper, Molybdenum, Gold Mineralisation in… — lapsed, 3.9 km away
- Expansion in existing Steel Plant at vill- Maslewa, Kolabira,… — returned to applicant, 3.9 km away
- Expansion in existing Steel Plant at vill- Maslewa, Kolabira,… — returned to applicant, 3.9 km away
- 0.5 MTPA Electrical Steel Complex — cleared for impact study, 4.7 km away
More from Pratik Hetamsaria in Saraikela-Kharsawan
- Bara Khiri Stone Deposit — under environmental review
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.