Quick answers
What is this project?
Expansion of an Integrated Mini Steel Plant by Increasing the Production of Sponge Iron From 2,10,000 Tpa to 2,80,500 Tpa by Change in Raw Material Mix in Existing 2x350 Rotary Kiln, Production of Billets From 2,21,760 Tpa to 2,23,000 Tpa by Replacing 4x12 T to 3x30 T of If, Production of 2,23,000 Tpa Tmt Bars /Rods/Wire Rods by Rolling Mill and Installation of 0.8 Mtpa Pellet Plant is a lapsed industrial project in Kandra (Ct), Adityapur(Gamharia), Saraikela-Kharsawan, Jharkhand. The site covers 59 acres.
Who is building it?
The applicant is Amalgam Steel and Power Limited.
Has it been approved?
No. The application was lapsed on 30 Aug 2026, so it is no longer under consideration.
Where is it?
In Kandra (Ct), Adityapur(Gamharia), Saraikela-Kharsawan, Jharkhand.
How big is it?
It has a stated cost of ₹7.3 crore and a site of 59 acres.
When was it filed?
The application was filed on 26 Oct 2024.
Project details
| Official title | Expansion of an Integrated Mini Steel Plant by Increasing the Production of Sponge Iron From 2,10,000 Tpa to 2,80,500 Tpa by Change in Raw Material Mix in Existing 2x350 Rotary Kiln, Production of Billets From 2,21,760 Tpa to 2,23,000 Tpa by Replacing 4x12 T to 3x30 T of If, Production of 2,23,000 Tpa Tmt Bars /Rods/Wire Rods by Rolling Mill and Installation of 0.8 Mtpa Pellet Plant Along With Coal Gasifier by Amalgam Steel & Power Limited at Kandra Chowka Road, Kandra, Jharkhand |
|---|---|
| Status | Lapsed |
| Status since | 30 Aug 2026 |
| Application filed | 26 Oct 2024 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | Amalgam Steel and Power Limited |
| Land area | 59 acres (23.9 ha) |
| Project cost | ₹7.3 crore |
| Village / locality | Kandra (Ct) |
| Taluk / tehsil | Adityapur(Gamharia) |
| District | Saraikela-Kharsawan |
| State | Jharkhand |
| Location from | Site boundary on record |
| Our reference | WID-JH-00810 |
In context
47 applications in Saraikela-Kharsawan since January 2022 are in the same category (Industry): 24 approved, 11 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 59 acres, this one is larger than 57% of them.
12 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kandra (Ct), Adityapur(Gamharia), Saraikela-Kharsawan, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Change in the raw material mix by replacement of Domestic Scrap with Imported… — initial checks, 0 m away
- Change in the Raw Material Mix by Inclusion of Ld Sludge for Production of 1.2… — initial checks, 500 m away
- Amendment in Existing 1.2 MTPA Pellet Plant with Installation of PGP (Producer… — environmental approval granted, 500 m away
- 132KV D/C Chandil Rajkharsawan Lilo at Kandra Transmission Line — more information requested, 1.5 km away
- Proposed expansion of existing steel plant to Integrated Steel Plant through… — under environmental review, 2.3 km away
- Proposed expansion of existing steel plant to Integrated Steel Plant through… — cleared for impact study, 2.3 km away
- Proposed expansion of existing sponge iron plant through installation of 2 X… — lapsed, 2.3 km away
- Diversion of Forest Land for Laying of 11 KV Underground Power Cables Along/… — under forest review, 3.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.